My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJ00505
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
PROJ00505
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 11:43:27 AM
Creation date
10/5/2006 11:58:34 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153419
Contractor Name
San Miguel Water Conservancy District
Water District
0
County
San Miguel
Bill Number
XB 99-999
Loan Projects - Doc Type
Feasibility Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
178
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />I <br /> <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br />II <br />: I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br />I <br />I <br /> <br /> <br />I <br /> <br />s. <br /> <br />Initiation of discussions between the involved ditch companies <br /> <br /> <br />regarding the manner of operation of the enlargement. <br /> <br />The work previously performed is directly applicable to the <br />presently proposed feasibility study, and it is the intent of the San <br />Miguel District that this work should represent their matching share <br />for completion of the study. <br /> <br />D. <br /> <br />Study Approach <br /> <br />While the product of the study will be a report conforming to <br /> <br /> <br />the outline as published in the CWCB guidelines, some aspects will <br /> <br /> <br />require more effort than others. The intent will be to provide plans <br /> <br /> <br />in sufficient detail to allow the District to apply for construction <br /> <br /> <br />funding in the Fall of 1984 if, as a result of the study, a <br /> <br /> <br />satisfactory construction, operation, and repayment plan has been <br /> <br />identified. <br /> <br />Emphasis of the study will be in three major areas: <br /> <br />1. Water availability and manner of utilization of existing water <br /> <br /> <br />rights. <br /> <br /> <br />2. Field investigations to provide a firm basis for design. <br /> <br /> <br />3. Financial analysis and plan of repayment. <br /> <br />E. <br /> <br />Study Tasks <br /> <br />The study tasks have been identified to conform to the format of <br />the CWCB outline and are described below: <br /> <br />TASK DESCRIPTION <br /> <br />Chapter I - General Information <br /> <br />I. Prepare Project Map - The project map will be combined with the <br /> <br /> <br />service area map and will cover the areas served by the Cone and <br /> <br />Gurley Ditches. <br /> <br />-2- <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.