My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJ00504
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
PROJ00504
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 11:03:46 AM
Creation date
10/5/2006 11:58:30 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153334
Contractor Name
Henry Waneka Mutual Reservoir Company c/o City of
Contract Type
Loan
Water District
6
County
Boulder
Bill Number
FSA
Loan Projects - Doc Type
Feasibility Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
129
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />II <br />I <br /> <br />I <br /> <br />I. GENERAL INFO~~TION <br /> <br />I <br /> <br />A. Authorization <br /> <br />I <br /> <br />I <br /> <br />The Henry Waneka Mutual Reservoir Company (HWMRC) submitted an application <br />to the Colorado Water Conservation Board (CWCB) for participation in the rehab- <br />ilitation of Waneka Dam. The funding would be through the Water Project Con- <br />struction Fund. As part of the application, the CWCB has required that a study <br />be prepared which provides for an engineering analysis of the dam and appurten- <br />ant structures and determines the feasibility of the improvements. As the <br />major stockholder in the HWMRC, the City Council of the City of Lafayette approved <br />their participation in the study on August 9, 1980. A copy of the City's autho- <br />rization letter is enclosed in Appendix-A. <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />Water Resources Consultants, Inc. (WRC) was selected as the consulting <br /> <br /> <br />engineering firm to perform the study. The results of the study are presented <br /> <br /> <br />in this report, submitted to the HWMRC, the City of Lafayette, and the CWCB <br /> <br /> <br />for consideration and implementation. <br /> <br />I <br /> <br />I <br /> <br />B. Purpose and Scope <br /> <br />I <br /> <br />I <br /> <br />The purpose of this study is to provide a detailed evaluation of the <br />existing Waneka Dam and Reservoir, to develop alternatives and improvements <br />to increase stability and storage capacity, and to evaluate the technical and <br />economic'feasibility of the improvement alternatives. The scope of work is based <br />upon the CWCB Guidelines for Preparation of Feasibility Reports (Reference-I) and <br />other specific requirements of the HWMRC. The detailed scope of work, which <br />will meet the study objectives, includes the following tasks: <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />1 - Meet with the representatives of the CWCB, HWMRC, City of Lafayette, <br /> <br /> <br />Colorado Division of Water Resources (State Engineer's Office), <br /> <br /> <br />Utility Companies, and other private or public agencies for basic <br /> <br /> <br />information and data gathering. <br /> <br />I I <br /> <br />I <br /> <br />-4- <br />
The URL can be used to link to this page
Your browser does not support the video tag.