My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C153796 Feasibility Study
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
C153796 Feasibility Study
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 11:25:15 AM
Creation date
10/5/2006 11:58:27 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153796
Contractor Name
Hawkeye Lateral Ditch Company
Contract Type
Loan
Water District
72
County
Mesa
Bill Number
HB98-1189
Loan Projects - Doc Type
Feasibility Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
79
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />IP.S. DEPARTMENT OF AGRICULTURE <br />~ATURAL RESOURCES CONSERVATION SERVICE <br />Gr~nd Junction (970)242-4511 <br /> <br />Page 3 of 3 <br />Nov 18, 1997 <br /> <br />1 <br /> <br /> <br /> <br />1 Client Name: Hawkeye Ditch Co. <br />Business Name: Hawkeye Ditch Co. <br />Business ID: 1604 . <br /> <br />1-------------------------------------------------------------------------------- <br /> <br /> <br />1 <br />1 <br />1 <br />1 <br />1 <br /> <br /> <br />1-------------------------------------------------------------------------------- <br /> <br /> <br />1 <br />1 <br />1 <br />I <br />1 <br />1 <br />I <br />1 <br />I <br /> <br />Assistance Notes for Date Range <br />11/17/97 - 11/18/97 <br /> <br />Assistance Type: Technical Assistance <br />Fund ID: rES <br /> <br />Assisted By: MR <br />Date: 11/17/97 <br /> <br />Note: <br />-continue technical note from pre-construction meeting (11-17-97)- <br /> <br />-To avoid the use of frozen backfill material, <br />a day shall be backfilled during the same day. <br />-Louis will determine when 1 1/2" rock will be needed to <br />trench bottom. Up to 300 cu-yds may be needed. <br /> <br />all pipe installed during <br /> <br />firm up the <br /> <br />-Later: Louis called Mark Gavell to tell him that the gravel used <br />all backfilling operations will needed to be inspected before any <br />brought to the site. <br /> <br />for <br />is <br /> <br />If the contractor has any questions <br />Brent Young and/or Louis Hartbauer. <br />will direct the question to someone <br /> <br />or concerns he should <br />They will answer any <br />who can. <br /> <br />direct them to <br />questions or <br />
The URL can be used to link to this page
Your browser does not support the video tag.