My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJ00502
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
PROJ00502
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 11:43:27 AM
Creation date
10/5/2006 11:58:26 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153419
Contractor Name
San Miguel Water Conservancy District
Water District
0
County
San Miguel
Bill Number
XB 99-999
Loan Projects - Doc Type
Contract Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />. <br /> <br />, <br />. . <br /> <br />~ <br /> <br />'. <br /> <br />. <br /> <br />TASK DESCRIPTION - Continued <br /> <br />Chapter VIII - Financial Program <br /> <br />17, Prepare Repayroent Schedule - proj ect will be essentially for <br /> <br /> <br />irrigation purposes and will be repaid from water sales. <br /> <br />General <br /> <br />18, Draft and Edit Report - Writing will proceed intermittently <br />throughout st~~y period. Preliminary drafts will be available at <br />review meetings. <br /> <br />F. Manpower Schedule <br /> <br />It is proposed that some aspects of this study will proceed <br /> <br /> <br />concurrently with the area-wide appraisal study to be carried out <br /> <br /> <br />during approximately the same period. By utilizing some of the same <br /> <br /> <br />personnel. some of the study C~sts (particularly transportation) can <br /> <br /> <br />be reduced. The table on the following page provides a monthly <br /> <br /> <br />schedule of manpo..'er commitments by task number as described in <br /> <br /> <br />paragraph E. <br /> <br />G. Milestones <br /> <br />Proposed milestones durin!; the preparation of the feasibility <br />study are as folla.s: <br /> <br />June 1 - Notice to proceed <br /> <br /> <br />June 10 - Commence drilling and geologic investigation <br /> <br /> <br />June 15 - Field inspection with owners <br /> <br /> <br />June 30 - Submit conceptual plan of operation to owners <br /> <br /> <br />July 30 - Submit draft water supply study to owners <br /> <br /> <br />August 30 - Meet wi~h CWCB and State Engineer personnel to discuss <br /> <br /> <br />proposed designs <br /> <br /> <br />-6- <br />
The URL can be used to link to this page
Your browser does not support the video tag.