Laserfiche WebLink
<br />-2- <br /> <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />i <br /> <br />o <br /> <br />Appraisal-level engineering designs and associated cost esti- <br /> <br /> <br />mates, including capital, operation, maintenance and replace- <br /> <br /> <br />ment costs. <br /> <br />o <br /> <br />Preparation of a comprehensive report which summarizes the <br />work completed during the study. <br /> <br />HYDROLOGY AND RESERVOIR SEDIMENTATION <br /> <br />The estimated average annual runoff at the dam site is 3,600 cfs or <br />2,600,000 ac-ft per year. The Probable Maximum Flood (PMF) flow for which the <br />spillway is de'signed is estimated to be 130,000 cfs. This flood peak is com- <br />posed of the runoff resulting from the Probable Maximum Precipitation (PMP) <br />plus the maximum historical snowmelt flood. Estimates of the probable rate of <br />accumulation of sediment in the reservoir indicate that the gross usable ca- <br />pacity would decrease from its original 196,000 ac-ft to 106,500 ac-ft after <br />100 years. <br /> <br />WATER RIGHTS AND STORABLE WATER <br /> <br />The Colorado River Water Conservation District holds a conditional <br />decree for the Una Reservoir Project for 195,983.5 ac-ft of storage and 2,100 <br />cfs of direct flow rights with an appropriation date of March 16, 1965. An <br />evaluation of the physical and legal availability of Colorado River water for <br />storage at the, Una Project based on this decree and estimated depletions by <br />other senior water rights was made. <br /> <br />The transfer of the Placita Reservoir conditional water rights <br /> <br /> <br />decree on the Grystal River, with an appropriation date of April 22, 1951, to <br /> <br /> <br />Una Reservoir 'NaS also evaluated. This evaluation does not imply an imminent <br /> <br /> <br />transfer of this decree, but was done only to investigate the effect of such <br /> <br /> <br />an assumed transfer on the yield of Una Reservoir. <br />