Laserfiche WebLink
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />the Placita Decree transferred to Una. Also to be considered <br /> <br /> <br />are the expected points of diversion of Project water yield, <br /> <br /> <br />power and non-power releases, reservoir evaporation, variable <br /> <br /> <br />headwater-tail water levels, power conduit head losses, and <br /> <br /> <br />turbine efficiencies. <br /> <br />o <br /> <br />Select the Project arrangement best suited for the site. The <br /> <br /> <br />selection will be based on studies of al ternati ve conceptual <br /> <br /> <br />designs of Project features and types of dam, considering the <br /> <br /> <br />resul ts of the preliminary operation studies for water yield, <br /> <br /> <br />site inspections and geotechnical investigations. Dam types <br /> <br /> <br />to be considered are embankment and concrete. The most eco- <br /> <br /> <br />nomical ~d practical alternative concept will be selected. <br /> <br />o <br /> <br />Study alternative railroad relocation alignments and select <br />the most economical and practical route. <br /> <br />o <br /> <br />Study other relocation needs and make estimates of their <br /> <br /> <br />requirements. These include an existing transmission line <br /> <br /> <br />and new municipal facilities located at the upper end of the <br /> <br /> <br />reservoir. <br /> <br />o <br /> <br />Optimize the design of the Project features and develop pre- <br /> <br /> <br />liminary design drawings of the selected Project arrange- <br /> <br /> <br />ment. This will include design optimization studies for the <br /> <br /> <br />outlet conduit to maximize power benefits; development and <br /> <br /> <br />evaluation of the preliminary design of the dam, spillway, <br /> <br /> <br />and powerhouse based on the results of field investigations; <br /> <br /> <br />and selection of mechanical and electrical powerhouse equip- <br /> <br /> <br />ment. <br /> <br />o <br /> <br />Based on a literature review, consultation with the State, <br /> <br /> <br />and the results of the operation studies, and the water <br /> <br /> <br />rights evaluation, estimate the potential uses of the water <br /> <br /> <br />supply developed by the Project. Recreational use is outside <br /> <br />the scope of the study. <br /> <br />1-5 <br />