My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJ00492
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
PROJ00492
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 11:43:26 AM
Creation date
10/5/2006 11:57:47 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153364
Contractor Name
Beck, R. W. and Associates
Water District
0
County
Garfield
Bill Number
SB 81-439
Loan Projects - Doc Type
Feasibility Study
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
458
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I, <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />TABLE OF CXlNTENTS (cont.) <br /> <br />Section Page <br />Number Section and Subsection Title Number <br />VI PROJECT ALTERNATIVE ARRANGEMENTS (cont. ) <br /> F. Installed Power Capacity VI-8 <br /> 1. General VI-8 <br /> 2. Power Plant Costs VI-10 <br /> 3. Power Benefits VI-10 <br /> 4. Net Benefit Analysis VI-12 <br /> G. Outlet Works VI-14 <br /> 1. General VI-14 <br /> 2. Location VI-14 <br /> 3. Arrangement VI-15 <br /> H. Railroad Relocation VI-18 <br /> <br />VII DESCRIPTION OF SELECTED PROJECT <br /> A. General VII-1 <br /> B. Dam VII-l <br /> C. Dam Stability Analysis VII-3 <br /> D. Spill way VII-3 <br /> E. Reservoir VII-6 <br /> F. Power Conduit and Outlet Works VII-1 <br /> G. Powerhouse VII-9 <br /> H. Switchyard VII-10 <br /> I. Transmission Facilities VII-10 <br /> 1. New Transmission Line VII-11 <br /> 2. Terminal Station VII-11 <br /> J. Access Roads VII-l1 <br /> K. Railroad Relocation VII-12 <br /> L. Relocations of Municipal Facilities VII- 13 <br /> M. Other Relocations VII-15 <br /> 1. General VII-15 <br /> 2. Initial Stage VII-16 <br /> 3. Second Stage VII-16 <br /> 4. Third (Final) Stage VII-11 <br /> <br />VIII PROJECT COST AND SCHEDULE <br /> <br />A. General <br />B. Basis of Cost <br />1. Direct Construction Cost <br />2. Contingency <br />3. Engineering and Owner Administration <br />4. Total Construction Cost <br />5. Escalation <br />6. Interest During Construction <br />1. Total Project Cost <br /> <br />VIII-1 <br />VIII-1 <br />VIII-1 <br />VIII-4 <br />VIII-4 <br />VIII-16 <br />VIII-16 <br />VIII- 16 <br />VIII-16 <br />
The URL can be used to link to this page
Your browser does not support the video tag.