My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJ00492
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
PROJ00492
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 11:43:26 AM
Creation date
10/5/2006 11:57:47 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153364
Contractor Name
Beck, R. W. and Associates
Water District
0
County
Garfield
Bill Number
SB 81-439
Loan Projects - Doc Type
Feasibility Study
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
458
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />TABLE OF CONTENTS (cont.) <br /> <br />Section <br />Number <br /> <br />III <br /> <br />Section and Subsection Title <br /> <br />WATER RIGHTS EVALUATION AND STORABLE FLOW ANALYSIS <br /> <br />A. General <br />B. Water Rights Applicable to Una Reservoir <br />C. Future Depletions and Storable Flows <br /> <br />IV RESERVOIR OPERATION STUDIES <br /> <br />V <br /> <br />A. General <br />B. Cases Considered <br />C. Potential Uses of Water <br />1 . General <br />2. Upstream or Downstream Use of Project Water <br />3. Water Use Schedule <br />D. Firm Water Yield <br />E. Power Operation <br />1 . General <br />2. Power Plant Characteristics <br />3. Flood Control Operation <br />4. Withdrawals for Consumptive Use <br />5. Mode of Power Operation <br />6. Power Output <br /> <br />SUMMARY OF GEOTECHNICAL INVESTIGATIONS <br /> <br />A. Site Geology <br />B. Field Investi~tions and Materials Testing Programs <br />C. Geology of Project Features <br />1. Reservoir <br />2. Dam, Outlet Conduit and Powerhouse Features <br />3. Spillway <br />4. Railroad Relocation <br />D. Construction Materials Exploration and Testing <br />E. Seismicity <br />1. Fault Study <br />2. Seismic Risk Evaluation <br /> <br />VI PRO;rECT ALTERNATIVE ARRANGEMENTS <br /> <br />A. General <br />B. Dam Location <br />C. Embankment Dam Axis <br />D. Type of Dam <br />E. Spillway <br />1. Location <br />2. Type <br /> <br />Page <br />Number <br /> <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />, <br /> <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I' <br />f <br /> <br />III-1 <br />III-1 <br />III-2 <br /> <br />IV-1 <br />IV-1 <br />IV-2 <br />IV-2 <br />IV-2 <br />IV-4 <br />IV-4 <br />Iv-8 <br />Iv-8 <br />IV-11 <br />IV-11 <br />IV-11 <br />IV-11 <br />IV-12 <br /> <br />V-1 <br />V-2 <br />V-3 <br />V-3 <br />V-4 <br />V-6 <br />v-6 <br />V-7 <br />V-9 <br />V-9 <br />V-9 <br /> <br />VI-l <br />VI-1 <br />VI-2 <br />VI-3 <br />VI-6 <br />VI-6 <br />VI-6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.