My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJ00489
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
PROJ00489
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 11:03:45 AM
Creation date
10/5/2006 11:57:43 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153486
Contractor Name
Farmers Water Development Company
Contract Type
Loan
Water District
0
County
San Miguel
Bill Number
SB
Loan Projects - Doc Type
Contract Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
43
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />,\ ' <br /> <br />. <br /> <br />. <br /> <br />~.. ' <br /> <br />the impoundment. The inspection effort will be <br />concentrated on the outlet conduit and areas with <br />existing sinkholes. This task will be performed <br />immediately following authorization to proceed in <br />conjunction with the backhoe investigation. A detailed <br />written summary of the results of the site inspection <br />wi 11 be prepared and presented as part of the remed i a 1 <br />design report. <br /> <br />Outlet Conduit <br /> <br />The existing outlet structure will be subjected to a <br />detailed inspection to evaluate its configuration, <br />condition and materials of construction. The externally <br />visible portions of the structure, including the intake. <br />control tower, and outfall will be visually inspected, <br />measured, and photographed. The outlet structure wi 11 be <br />visually inspected internally to allow evaluation of <br />possible seepage entry points and possible conduit <br />deteri orat ion. The structural dimens ions wi 11 be <br />obtained so that a scale drawing of the outlet works can <br />be generated for use during the remedial design. <br /> <br />Embankment and Impoundment <br /> <br />The existing sinkholes will be dimensioned and <br />, <br />located on a suitable map based on surveyed coordinates <br />and elevation. A walk-over inspection of the remainder of <br />the impoundment wi 11 be conducted to locate other <br />possible sinkhole sites and bedrock outcrops in general. <br />These sites will also be located on the map. In addition, <br />springs and associated measuring weirs in the area <br />immediately downstream of the dam will be located and <br />shown on the map. A surface assessment of the site <br />geology will also be made at this time. <br /> <br />-5- <br />
The URL can be used to link to this page
Your browser does not support the video tag.