<br />Boulder and Left Hand Repair of Outlet Works
<br />CWCBFeasibilityStudy
<br />NovemberS, 1999
<br />
<br />feet of freeboard as the dam crest will be regraded to gage height 12.7, This design will pass the
<br />required design inflow flood without the dam overtopping as required by the SEa,
<br />
<br />The vehicle turnaround will be constructed on the upstream slope near the spillway facilities using
<br />reinforced earth with a gunnite facing, The reinforced earth will be constructed at a near vertical angle
<br />from the toe of the upstream slope, This will allow a wider crest without a significant decrease in
<br />storage capacity,
<br />
<br />Cost Estimate
<br />
<br />The selected alternative is estimated to cost a total of $140,500 ($110,500 for construction, $15,000 to
<br />complete the hydrologic evaluation and $15,000 to complete the design and feasibility study), The
<br />construction cost estimate, including contingencies, was provided by the Ditch Company's engineer
<br />and is summarized on Table 7,
<br />
<br /> Table 7
<br /> Summary of Estimated Total Project Cost
<br /> Item Estimated Cost
<br />1, Subtotal Hydrology Study, Feasibility Study and Design Costs $30,000
<br /> ($35,000 less $5,000 CWCB Grant)
<br />2, Construction of Outlet Works, Spillway Replacement, and $79,300
<br /> Crest Regrad i ng
<br />3, Construction of Vehicle Turnaround $17,600
<br />4, Subtotal - Construction (Lines 2 and 3) $96,900
<br />5, Construction Engineering (4,0% of Line 4) $3,900
<br />6, Contingencies (10% of Line 4) $9,700
<br />7, Subtotal - Engineering Supervision and Construction Costs $110,500
<br /> (Lines 4, 5 and 6)
<br />8, Grand Total- Feasibility, Design and Construction $140,500
<br /> (Line 1 and Line 7)
<br />
<br />Implementation Schedule
<br />
<br />The design plans for replacing the outlet works, incorporating a drop-inlet spillway into the outlet
<br />works, regarding the dam crest, and constructing a vehicle turnaround at the outlet structure will be
<br />completed by mid-December. The SEa will have to review and approve the design plans before
<br />construction can occur, The SEa has up to 180 days to review and approve the plans; however with
<br />cooperation of the SEa, it is the intent of the Ditch Company to have the plans approved by the end of
<br />February, 2000 so that construction can start by March 1,2000, The work is estimated to require
<br />about 30 to 45 days and should be completed by April 15, 2000,