Laserfiche WebLink
<br />o <br /> <br />. <br /> <br />. <br /> <br />~ <br /> <br />Study Plan - Greeley and Loveland Irrigation System Rehabilitation FeaslblUty Study <br /> <br />Page 6 <br /> <br />ESTIMATED COST <br />The summary of the estimated task costs are shown in the following table: <br /> <br />Task No. Description Estimated <br /> Cost <br />I Data Collection $8,120 <br />2 Hydrologic Analysis 4,560 <br />3 Existing Facilities Evaluation 7,120 <br />4 Alternative Development 19,240 <br />5 Alternative Evaluation 8,120 <br />6 Board Presentation 2,048 <br />7 Study Report 7,720 <br />8 Coordination Meetings 3,120 <br /> Subtotal Salary Costs $60,048 <br /> Subtotal Direct Costs <br /> (Telephone, Reproduction, Mileage, Postage, Software - CanaIMan $1,725 <br /> (Client Copy)) <br /> Subconsultants <br /> Surveying $3,000 <br /> Environmental-ERa $2,000 <br /> TOTAL PROJECf COST $66,773 <br /> <br />F:\PROJECTSIGREELE--1ICWCBIGRELOV,PRO <br />