My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJ00484
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
PROJ00484
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 11:03:45 AM
Creation date
10/5/2006 11:57:25 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153788
Contractor Name
Greeley and Loveland Irrigation Company
Contract Type
Loan
Water District
3
County
Weld
Bill Number
FSL
Loan Projects - Doc Type
Feasibility Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />, <br /> <br />. <br /> <br />. <br /> <br />Study Plan - Greeley and Loveland Irrigation System Rehabllltation Feasibility Study <br /> <br />Page 4 <br /> <br />Task 4 - Alternative Development <br />Objective: iW I If <br />Several alternatives ~ be developed including structural and nonstructural elements in an attempt to identify <br />the least costly combination of measures for achieving the study objective, <br /> <br />Methodology: ,::. ~j,./,K ",fJ /~ vle",cuA. -? <br />I. Develop IHl altemllli.e 3)- matft" which will identify structural (i,e, spillway enlargement, canal <br />lining, check structure rehabilitation, turnout rehabilitation, ete,) and ponstructural (i,e, incremental <br />damage analyses, operational changes, etc,) altemati, GS, j? t- .e.-/?A# ~ <br />J!1, ~/~/h-<- a-~~ /X-- -<--IdrU7v-<? <br />1'roducts: <br />1, A memorandum will be prepared describing the methods used in developing the alternative matrix, The <br />matrix will be used in Task 5 Alternative De, elepu'2:-- ;::v~ ' <br /> <br />Task 5 - Alternative Evaluation <br />Objective: <br />The alternatives identified in Task 4 must be evaluated to distinguish the differences between them and to <br />formnlate up to three sound system alternatives, <br /> <br />Methodology: <br />I. The alternative matrix will be reduced to system alternatives, The six evaluation factors used by the <br />CWCB will be used which include the following: <br />a, description of project outputs or yields; <br />b, project costs including capital costs, annual costs and cost per unit of output; <br />c, impacts on the man-made environment, the natural environment, and existing social structure; <br />d, the ~cial feasibility of the proposed project as measured by the project sponsor's ability to <br />repay all reimbursable costs; <br />e, institutional requirements for project implementation; and <br />f. any special technical problems which shonld be taken into consideration, <br /> <br />Products: , 2 <br />I. A memorandum will be prepared describing the methods used in evaluating ~ternative ma~ . <br />2, System alternatives ~ll bI }leveloped frp~ the altern~tive JUa!fix evaluation that addresses the study <br />objective,? ~~ W,~...or- Sb-/~ ~.t~s) 7- ~ <br /> <br />-;;:f-K ~- ;t:/'VWIt~.A"'- ~, s;'~e ~/~/J;4~~ <br />Task ~ompany's Board Presentation <br />Objective: ;Z 4A4!- <br />The project sponsors...eed-to be informed of the study results and to incorporate their comments and suggestions <br />into the study, <br /> <br />Methodology: <br />1, Present a summary of the study to the project sponsors, <br /> <br />F:\PROJECTS\GREEL&-lICWCBIGRELOV,PRO <br /> <br />-; t/I'1t / ~ :::r/lr# ~.c:e<!&?"c/ 4h ~ 2'c, <br />
The URL can be used to link to this page
Your browser does not support the video tag.