My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJ00484
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
PROJ00484
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 11:03:45 AM
Creation date
10/5/2006 11:57:25 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153788
Contractor Name
Greeley and Loveland Irrigation Company
Contract Type
Loan
Water District
3
County
Weld
Bill Number
FSL
Loan Projects - Doc Type
Feasibility Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />. <br /> <br />. <br /> <br />Mr. Ed A, Toms, P,E, <br />January IS, 1997 <br />Page Two <br /> <br />the fmal selected alternative, The financial plan requirements are described in <br />itemj, on page 27 and on pages B-4 through B-6 of Appendix B of the <br />Guidelines, <br /> <br />5, A thorough discussion of institutional considerations should be included in the <br />POS either as a separate task or as part of another task such as the alternatives <br />evaluation, This is described in item k, on page 27 and on page B-7 in Appendix <br />B of the Guidelines, <br /> <br />Please let me know if you have any questions or if we can be of any assistance, <br /> <br />Sincerely, <br /> <br />~/J~ <br /> <br />William E, Green, P,E, <br />Manager of Planning <br />Project Planning and <br />Construction Section <br /> <br />cc: Bill Stanton, CWCB <br />David Bernhardt, Greeley and Loveland Irrig, Co, <br /> <br />WEG/vt <br /> <br />1:\wctrans\secb\ecLdoc <br />
The URL can be used to link to this page
Your browser does not support the video tag.