Laserfiche WebLink
<br />. <br /> <br />. <br /> <br />Mr. Ed A, Toms, P,E, <br />January IS, 1997 <br />Page Two <br /> <br />the fmal selected alternative, The financial plan requirements are described in <br />itemj, on page 27 and on pages B-4 through B-6 of Appendix B of the <br />Guidelines, <br /> <br />5, A thorough discussion of institutional considerations should be included in the <br />POS either as a separate task or as part of another task such as the alternatives <br />evaluation, This is described in item k, on page 27 and on page B-7 in Appendix <br />B of the Guidelines, <br /> <br />Please let me know if you have any questions or if we can be of any assistance, <br /> <br />Sincerely, <br /> <br />~/J~ <br /> <br />William E, Green, P,E, <br />Manager of Planning <br />Project Planning and <br />Construction Section <br /> <br />cc: Bill Stanton, CWCB <br />David Bernhardt, Greeley and Loveland Irrig, Co, <br /> <br />WEG/vt <br /> <br />1:\wctrans\secb\ecLdoc <br />