My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJ00481
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
PROJ00481
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 11:43:26 AM
Creation date
10/5/2006 11:57:17 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153030
Contractor Name
Eagle, Town of
Contract Type
Grant
Water District
0
County
Eagle
Bill Number
XB 99-999
Loan Projects - Doc Type
Contract Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />RAYMONO J. SCHUSTER, P,E. & L. S. <br />CHIEF ENGINEER <br /> <br />r- <br />r. McDERMITH AND ~CHUS:"". <br /> <br />CONSUL TlNG ENGINEERS AND LAND SURVEYORS <br />Star Route' Box 28 <br />Cedaredge. Colorado 81413 <br />835-3796 <br /> <br />ALAN M(.DERMlTH, P.E. & l.. s. <br />SPECIAL CONSULTANT <br /> <br />August 7, 1975 <br /> <br />')f"C' '-I'V'[-'D <br />f\L t:.I L' <br />AUG 11 1975 <br /> <br />Mr. N. C. Ioannides <br />Water Resource Engineer V <br />Department of Natural Resources <br />Colorado Water Conservation Board <br />102 Columbine Building <br />1845 Sherman Street <br />Denver, Colorado 80203 <br /> <br />COLO. WATER <br />CONSERVATION BOARD <br /> <br />Dear Sir: <br /> <br />RE: Proposal for engineering services - <br />Town of Eagle water system feasibility. <br />report <br /> <br />The following proposal breakdown is submitted in accordance with your request, <br />based on the criteria printed in the guidelines as published by the Colorado <br />Water Conservation Board, dated 1975, It is intended that the report will <br />comply with these requirements as set forth in the CWCB document entitled, <br />"Guidelines for Systems in the Conservation. and Utilization of COlorado's <br />Water Resources through the ColoradO Water Conservation Board's Construc- <br />tiDn Fund", <br /> <br />SCOPE OF WORK <br /> <br />1. Prefacing Material. The. feasibility report will contain the following <br />material in the preface: <br /> <br />a, Title page <br />b. ~etter of transmittal from the town of Eagle <br />c, ResDlution from the town of Eagle <br />d, Table of Contents <br />e. List of maps, exhibits and tables <br />f, Project Summary (This will be a brief resume' of the contents <br />of the feasibility report.) <br /> <br />2, General Information, . The feasibility report shall include a project <br />map which illustrates graphically the proposed project and the location <br />of the basic existing and proposed water system with respect to the <br />source of the water supply. This map .will also show the lands to be <br />served and will also show the relation of the town of Eagle with respect <br />to larger towns in the vicinity. Where applicable, to avoid confusion <br />and to more readily illustrate the points to be considered, the map will <br />be multi-colored. The report shall also contain information such as lo- <br />cation, climate, and all pertinent data. to relate the reader to the area <br />about which he is reading. <br />
The URL can be used to link to this page
Your browser does not support the video tag.