My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJ00480
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
PROJ00480
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/15/2011 9:37:08 AM
Creation date
10/5/2006 11:57:08 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C150015
Contractor Name
Highland Ditch Company
Contract Type
Loan
Water District
5
County
Boulder
Bill Number
HB 98-1189
Loan Projects - Doc Type
Feasibility Study
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
221
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />I <br />\ <br /> <br />1 <br /> <br />-6- <br /> <br />1 <br /> <br />become thoroughly sa.tura.ted. All materieJ. seems to be in place, <br /> <br />1 <br /> <br />but seems to have settled.m9re or lese and rather unevenly. <br />Our oonclus1onEl 1n x:egard to .this structure are, <br />that the materieJ. in the easterly portion of the dam was not <br />Buf'fic1ently oanpacted, ~o1ds ~ving been J.e:ft between the, ;". . -..-,'._ <br />" ..~> ,-;..;,~~,I:J~r'."~':3'~i,~;::,~_' <br />chunks of clay, whioh, upon becoming thoroughly saturated.frOm <br />the water in the reservoir t have melted together, thereby oausing <br />a settlement or shrinksge in the structure .over these voids. We <br />do not bel1.eve the dam to be in B. dangerous condi t1on, and think <br />that it will beoome water tight hence entirely safe, if oare is <br />,- <br /> <br />1 <br /> <br />1 <br /> <br />I <br /> <br />exercised in filling and drawing off the reservoir eJ.lowing time <br /> <br />for the ambe.nl<ment to becane eJ.ternately saturated and drained, <br /> <br />which will cause said embe.nl<ment to gradually b ec ome settled and <br /> <br /> <br />compacted. <br /> <br />I <br /> <br />1 <br /> <br />We reo cmnend that the dam be allev/ed to' gradually drain <br /> <br />out this feJ.l and winter, and that"in the spring the water ahonld <br /> <br />be eJ.lowed to gradUeJ.ly rise on the embe.nl<ment Wlt:l:l excessive' . ,-" <br /> <br />seepsge shows upon the lower face, when the lake shonld again be <br /> <br />lev/ered eJ.lowing the dam to'drain and hence become more compacted.. <br /> <br />By Buch prooedure over a. period of ,two or three years it is our <br /> <br />1 <br /> <br />1 <br /> <br />opinion that the dam will bec:ome <br /> <br />thoroughly compacted and safe. <br /> <br />11th <br /> <br />, . <br /> <br /> <br />1 <br /> <br />MCH-NJ <br /> <br />1 <br /> <br />I <br /> <br />1 <br /> <br />1 <br /> <br />I <br /> <br />I <br /> <br />1 <br /> <br />, <br />j <br />,~ <br />~ <br />i <br />
The URL can be used to link to this page
Your browser does not support the video tag.