My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJ00479
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
PROJ00479
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 11:43:26 AM
Creation date
10/5/2006 11:56:58 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153472
Contractor Name
San Miguel Water Conservancy District
Water District
0
County
San Miguel
Bill Number
XB 99-999
Loan Projects - Doc Type
Feasibility Study
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
284
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />II <br />I <br /> <br />Engineering study team in arriving at a better mutual understanding of water supply and <br />availability, runoff patterns, and ditch and reservoir operations as well as potential <br />improvements to the existing irrigation systems. <br /> <br />Significant assistance for the public information program was provided by the San Miguel - <br />West Montrose County Cooperative Extension Office which assisted with meeting <br />arrangements, served as a local repository for study information and helped with local liaison <br />efforts. <br /> <br />Report Organization <br /> <br />This Final Report is intended to provide the reader with a concise summary of the results of <br />Phase 1 of the study and to assist the CWCB and the study participants in making a decision <br />regarding Phase 2 of the study. The report is organized as follows: <br /> <br />ChaDter <br /> <br />TODics Discussed <br />Introduction and background information, <br /> <br />II <br />III <br /> <br />Characteristics of the study area and existing institutions. <br /> <br />Water rights and hydrologic analyses to determine the <br />available water supply for potential projects. <br /> <br />IV <br /> <br />Water demands of potential cropping patterns. <br /> <br />V <br /> <br />Identification and selection of project elements and <br />formulation of six alternative projects, <br /> <br />Evaluation and comparison of alternative projects. <br /> <br />Demonstration of Alternative 4 operations, <br /> <br />Institutional considerations. <br /> <br />VI <br /> <br />VII <br />VIII <br />IX <br /> <br />Consideration of a pumped-storage hydroelectric power <br />project in San Miguel Canyon. <br /> <br />X <br /> <br />Conclusions and Recommendations, <br /> <br />8 <br />
The URL can be used to link to this page
Your browser does not support the video tag.