My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJ00470
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
PROJ00470
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 11:43:26 AM
Creation date
10/5/2006 11:56:42 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153477
Contractor Name
Victor, City of
Water District
0
County
Teller
Bill Number
XB 99-999
Loan Projects - Doc Type
Contract Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
42
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />. <br /> <br />. <br /> <br />2 <br /> <br />the emergency spillway, The report also concurred with the State <br />Engineer's recommendations that, as a minimum, a channel should <br />be excavated in the spillway so that the water level in the <br />reservoir is kept at least 3 feet below the crest of the dam. <br /> <br />It is our understanding that the spillway elevation was lowered <br />in the fall of 1984 as directed by the State Engineer. In <br />addition, a detailed topographic map of the embankment and <br />surrounding area was also prepared (Figure 2), It is our under- <br />standing that no other engineering studies have been performed <br />for the dam or spillway, primarily due to the lack of funding <br />available to the Town of Victor, <br /> <br />A meeting has been scheduled between Victor and the Colorado <br />Water Conservation Board on June 6, 1985 to discuss possible <br />funding for engineering studies and construction of the selected <br />dam rehabilitation alternative. <br /> <br />This proposal, which .is included as an attachment to Victor's <br />"Application for a State \7ater Project", presents a detailed <br />scope of work to complete a Phase I engineering evaluation and <br />preliminary design for the rehabilitation of Victor Dam No.2. <br />The Phase I scope of work includes a field investigation, labor- <br />atory testing, civil design engineering, and preparation of a <br />Phase I engineeri.ng report and preliminary design drawings. The <br />Phase II study would consist of additional field investigations <br />and engineering analyses (if required), and the preparation of <br />detailed construction drawings, specifications, and contract <br />documents. <br /> <br />This proposal includes only a cost estimate for the Phase I scope <br />of work. A cost estimate for the Phase II engineering services <br />will be prepared at the conclusion of Phase I, when the Phase II <br />scope of work will be known in more detail. <br />
The URL can be used to link to this page
Your browser does not support the video tag.