Laserfiche WebLink
<br />~ <br /> <br />. <br /> <br />. <br /> <br />18' <br /> <br />4.0 COST ESTIMATE AND SCHEDULE <br /> <br />A cost and manpower estimate for the Phase I engineering study is <br />as follows. <br /> <br />FIELD INVESTIGATIONS <br /> <br />Golder Associates <br /> <br />Associate, 10 hrs <br />Senior engineer, 10 hrs <br />Project engineer, 102 hrs <br />Subsistence <br /> <br />Greenborne and O'Mara <br />Senior engineer, 10 hrs <br />Survey crew (3 person crew), 20 hrs <br /> <br />$ 675 <br /> 500 <br /> 3,825 <br /> 1,200 <br /> 6,200 <br /> 456 <br /> 1,400 <br /> 1,856 <br /> <br />Drilling Subcontractor <br /> <br />Assume: 7 days drilling at 10 hrsjday <br /> <br />Includes: Mobjdemob <br />Subsistence <br />Crew travel <br />Materials <br />In-situ testing <br />40 feet NX core <br />6 shallow angle holes <br /> <br />Does not include (assumed to be provided by <br /> <br />City of Victor): <br />Access road improvements <br />Access to dam crest <br />Access to borrow areas <br /> <br />Subtotal <br /> <br />6,300 <br />$ 14,356 <br />