<br />. <br /> <br />. <br /> <br />14 <br /> <br />Construction Cost Estimate--A construction cost estimate for work <br />required to bring the dam and spillway into compliance with State <br />standards can reliably be made only after the completion of the <br />above seven tasks. This task will use unit cost breakdowns with <br />estimated quantities. A contingency allowance and estimated <br />engineering final costs will be added in to give a total figure <br />for future budgeting purposes. <br /> <br />3.5 Preparation of Phase I Engineering Report <br /> <br />Upon completion of the above described work, a Phase I report <br />will be prepared. The report will contain the results of the <br />field investigation program, laboratory testing, engineering <br />analyses, and construction cost estimate. The report will also <br />discuss the preliminary design considerations for the proposed <br />rehabilitation work and present a scope of work and cost estimate <br />for Phase II engineering and design studies. The report will be <br />presented along with the preliminary design drawings and will be <br />prepared by an engineer registered in the State ofcColorado. <br /> <br />3,6 Preparation of.CWCR Feasibility Report <br /> <br />Table 1 presents a summary of the CWCB requirements for the feasibility study <br /> <br /> <br />and which party (i.e. Greenhorne & O'Hara, Inc" Golder, or the Town of Victor) <br /> <br /> <br />will be responsible for providing the information. The end product of this task <br /> <br /> <br />will be acceptance of. the feasibility study by the CWCB, <br />