My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJ00467
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
PROJ00467
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 11:43:26 AM
Creation date
10/5/2006 11:56:33 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153313
Contractor Name
Eagle, Town of
Contract Type
Loan
Water District
0
County
Eagle
Bill Number
SB 78-69
Loan Projects - Doc Type
Feasibility Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
95
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />Generally, the customer or developer is charged with the full cost of <br /> <br />all line extensions necessary to deliver water to new service. The estimated <br /> <br />average residential usage computed billing from the present metered water rates <br /> <br />is shown in the following table. <br /> <br />~ <br /> <br />TABLE XI <br /> <br />Estimated Average Residential Billing <br /> <br /> Usage <br />. Month Gallons x 1,000 <br />January 5.7 <br /> February 8.6 <br /> March 5.7 <br /> April 17.4 <br /> May 21.0 <br /> June 26.5 <br /> July 23.6 <br /> August 31.4 <br /> September 31.2 <br /> October 20.0 <br /> November 17.5 <br /> December 9.7 <br /> TOTAL 218.3 <br /> <br />Total <br />Gallons Per Quarter <br /> <br />Existing <br />Billing <br /> <br />20.00 <br /> <br />$ 21. 00 <br /> <br />64.90 <br /> <br />43.68 <br /> <br />86.20 <br /> <br />57.53 <br /> <br />47.20 <br /> <br />32.18 <br /> <br />218.30 <br /> <br />$154.39 <br /> <br />The estimated water revenue for commercial users is $10,320 per year, <br /> <br />based on the 1975 usage. This figure, when added to the estimated average re- <br /> <br />sidential billing, will yield an estimated revenue of $74,840 in 1976. The <br /> <br />. <br /> <br />1976 estimated revenue is lower than the 1975 revenue, but this can be explained <br /> <br />by the reduction in some of the water-rates. <br /> <br />When the 1975 costs and revenues are projected into 1976 and 1977 (at <br /> <br />which time the project is most likely to be financed and constructed), we have <br /> <br />water tap fee revenues in 1977 of $5,500, water revenues of $78,000, O&M costs <br /> <br />of $48,000, and the old bond retirement of $31,550. This leaves an excess in <br /> <br />revenue over cost of $3,950. This figure is not enough excess revenue with <br /> <br />which to sell bonds to finance a new construction project. Therefore, it is felt <br /> <br />- 65 - <br /> <br />. <br />
The URL can be used to link to this page
Your browser does not support the video tag.