My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJ00467
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
PROJ00467
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 11:43:26 AM
Creation date
10/5/2006 11:56:33 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153313
Contractor Name
Eagle, Town of
Contract Type
Loan
Water District
0
County
Eagle
Bill Number
SB 78-69
Loan Projects - Doc Type
Feasibility Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
95
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />EAGLE REPORT <br /> <br />CHAPTER SEVEN <br /> <br />FINANCIAL <br /> <br />The revenue for water sales in 1974 was $31,504; and, the revenue for <br /> <br />water sales in 1975 was $75,346. The 139 percent increase in water revenue <br /> <br />was due largely to the new water rates which were put into effect on Jan- <br /> <br />uary I, 1975. These water rates are: <br /> <br />. <br /> <br />TABLE IX <br /> <br />Metered Rates - Per Quarter <br /> <br />First 30,000 gallons <br /> <br />$21.00 minimum <br /> <br />Each additional 1,000 gallons: <br />$0.65 per 1,000 gallons <br /> <br />Rural rates <br /> <br />$42.00 minimum <br /> <br />Each additional 1,000 gallons: <br />$1.30 per 1,000 gallons <br /> <br />In April, 1975 the following minimums were added to the rate schedules: <br /> <br />.- <br /> <br />Minimum for multiple dwelling units <br />Minimum for large motels <br /> <br />$21.00 for each living unit <br />$21.00, plus $1.50 per unit <br /> <br />These rates were again revised in 1976 to allow water users along the <br /> <br />raw water line who receive untreated water a lesser rate, and also allowed <br /> <br />for qualifying senior citizens a lesser rate. The current tap fees for the <br /> <br />town of Eagle's water system are as follows in the table below. <br /> <br />. <br /> <br />TABLE X <br /> <br />Actual cost of all labor and materials furnished by the town, plus <br />the following rates: <br /> <br />Service Line Size <br /> <br />3/4" or smaller <br />1" <br />I!,; - l~" <br />2" <br />3" <br />4" <br /> <br />Fee <br /> <br />$ 250 <br />400 <br />600 <br />960 <br />1,500 <br />2,600 <br /> <br />The tap fees for rural services are l~ times those for in-town <br />connections. <br /> <br />- 64 - <br />
The URL can be used to link to this page
Your browser does not support the video tag.