Laserfiche WebLink
<br />In evaluating the costs fOr the entire proposed improvements, it is <br /> <br />realized that the town's water system cannot support the repayment of any <br /> <br />loans required to finance the Project. However, the cost estimates will <br /> <br />be presented and a tabulation of priorities will be made; and based on <br /> <br />the financial capabilities of the town's water system, recommendations <br /> <br />will be made. <br /> <br />.. <br /> <br />The estimates of cost to develop the ground water domestic water <br /> <br />system will be kept separate from the other costs for improving the <br /> <br />existing system. It must be remembered that the cost for the distribution <br /> <br />system and storage facilities will remain the same whether surface or <br /> <br />ground water is used. <br /> <br />It was discussed earlier in this report that consideration should be <br /> <br />given to moving the point of diversion of water out Brush Creek closer to <br /> <br />the existing treatment facility. It was mentioned that this point of di- <br /> <br />version be relocated to a poin~ about 14,000 feet above the present treat- <br /> <br />ment facility. In the 1970 to 1971 construction period 4,500 feet of new <br /> <br />12" cast iron pipe was laid from the treatment facility South (up Brush <br /> <br />Creek). When making out the CQst estimates for the proposed point of di- <br /> <br />version, the cost of only 9,50Q feet of pipe will be considered. <br /> <br />Pages 55 and 56 will give the estimate of costs and summary of esti- <br /> <br />mated project costs to rehabilttate the existing system using the present <br /> <br />intake structure and settling ponds. Pages 57 and 58 will give the esti- <br /> <br />mate of costs and summary of e~timated project costs for the relocating <br /> <br />of the intake structure to a pOint about 14,000 feet above the existing <br /> <br />filter plant. Pages 59,60, and 61 will give the estimate of cost and <br /> <br />summary of estimated project Costs for the use of developing a ground <br /> <br />. <br /> <br />. <br /> <br />water source. <br /> <br />- 54 - <br /> <br />. <br />