My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJ00467
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
PROJ00467
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 11:43:26 AM
Creation date
10/5/2006 11:56:33 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153313
Contractor Name
Eagle, Town of
Contract Type
Loan
Water District
0
County
Eagle
Bill Number
SB 78-69
Loan Projects - Doc Type
Feasibility Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
95
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />For the purpose of illustration, let us assume that the projected water <br /> <br />requirements, as shown on Table VI, are correct. And, that the domestic and <br /> <br />commercial water requirements for the Eagle Ranch Corporation development <br /> <br />only require the treatment of domestic and commercial water. Then,by the <br /> <br />year 1991, the maximum daily requirement for the town of Eagle would be <br /> <br />1,671,773 gallons of water, which would be approaching the upper limit of <br /> <br />the expanded plant capacity of 1,987,000 gallons per day. <br /> <br />. <br /> <br />" <br /> <br />~~ <br /> <br />. <br /> <br />- 23 - <br />
The URL can be used to link to this page
Your browser does not support the video tag.