My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJ00467
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
PROJ00467
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 11:43:26 AM
Creation date
10/5/2006 11:56:33 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153313
Contractor Name
Eagle, Town of
Contract Type
Loan
Water District
0
County
Eagle
Bill Number
SB 78-69
Loan Projects - Doc Type
Feasibility Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
95
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />~ <br /> <br />Development <br /> <br />There are several proposed developments near the town of Eagle which <br /> <br />will require domestic water and which will probably want to be served do- <br /> <br />mestic water from the Eagle water system. <br /> <br />The Eagle Ranch Corporation, which owns a considerable amount of <br /> <br />acreage in the Brush Creek Valley above Eagle, is further along with this <br /> <br />plan than most of the other proposed development in the valley. The firm <br /> <br />of Wright Water Engineers, Inc. is in the process of completing a water <br /> <br />report for the Eagle Ranch Corporation and the development plan, as prepared <br /> <br />by Harmon, O'Donnell, and Henninger Associates, tabulates the water require- <br /> <br />ments for this development. These tables have been included in this report <br /> <br />at the request of Wright Water Engineers, Inc. The tabulations are listed <br /> <br />on pages 4 through 7 of the Harmon, O'Donnell, and Henninger Associates <br /> <br />report, and are entitled Table 1, Table 2, Table 3, and Table 4. These tables <br /> <br />are included in this report following this section. <br /> <br />It is anticipated that the Eagle Ranch Corporation would be willing to <br /> <br />trade some of its water rights to the town of Eagle in exchange for the <br /> <br />town of Eagle providing treated domestic water for their proposed development. <br /> <br />However, this is 'only speculation as the exact plans of not only the Eagle <br /> <br />Ranch Corporation, but other planned developments such as Adam's Rib are <br /> <br />not available to the public. <br /> <br />Table 2 illustrates that the total ultimate water requirements from <br /> <br />Brush Creek will be 1,468.5 acre-feet of water per year. The month of July <br /> <br />will require the most water at 246.4 acre-feet, or 4.01 cubic feet per <br /> <br />second (cfs). Of the July total of 246.4 acre-feet or water, 68.1 acre-feet <br /> <br />of water is required for domestic and commercial consumption, The balance <br /> <br />of the water requirement will be used for irrigating lawns, greenbelt, golf <br /> <br />. <br /> <br />~ <br /> <br />. <br /> <br />courses, etc. <br /> <br />- 21 - <br />
The URL can be used to link to this page
Your browser does not support the video tag.