My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJ00467
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
PROJ00467
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 11:43:26 AM
Creation date
10/5/2006 11:56:33 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153313
Contractor Name
Eagle, Town of
Contract Type
Loan
Water District
0
County
Eagle
Bill Number
SB 78-69
Loan Projects - Doc Type
Feasibility Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
95
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />an addition to the town's treated water storage. This alternate is estimated <br /> <br />to cost $827,000. <br /> <br />ALTERNATE NUMBER ONE <br /> <br />Distribution system <br />Raw water transmission line <br />Storage <br />Treatment plant <br />Settling ponds <br /> <br />$115,000 <br />444,000 <br />233,000 <br />8,000 <br />27,000 <br /> <br />. <br /> <br />TOTAL . . . . . <br /> <br />$827,000 <br /> <br />Construction Alternate Two takes into consideration the same factors <br /> <br />involved in Construction Alternate One, but the existing settling ponds and <br /> <br />intake structure would be abandoned in favor of the construction of a new <br /> <br />intake structure and settling ponds with rough filters closer to the existing <br /> <br />, <br /> <br />water treatment facility. This alternate is estimated to cost $640,000. <br /> <br />ALTERNATE NUMBER TWO <br /> <br />Distribution system <br />Raw water transmission line <br />Storage <br />Treatment plant <br />Settling ponds <br /> <br />$115,000 <br />174,000 <br />233,000 <br />8,000 <br />110,000 <br /> <br />$640,000 <br /> <br />TOTAL . . . . . <br /> <br />. <br /> <br />Construction Alternate Three contains the same aspects as both Construc- <br /> <br />tion Alternate Number One and Number Two, except that it uses a ground water <br /> <br />supply rather than a surface water supply. This alternate would involve <br /> <br />drilling wells rather than taking water out of Brush Creek. This alternate <br /> <br />is estimated to cost $466,000. <br /> <br />ALTERNATE NUMBER THREE <br /> <br />TOTAL . . . . . . . <br /> <br />$115,000 <br />233,000 <br />8,000 <br />110,000 <br /> <br />$466,000 <br /> <br />Distribution system <br />Storage <br />Treatment plant <br />Ground water proposal <br /> <br />11 <br /> <br />. <br />
The URL can be used to link to this page
Your browser does not support the video tag.