Laserfiche WebLink
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />Implementation Schedule <br /> <br />The following schedule is proposed for implementation of the project: <br /> <br />Task <br /> <br />I. <br />2. <br />3. <br />4. <br />5. <br />6. <br />7. <br />8. <br />9. <br />10. <br />II. <br /> <br />Target Date <br /> <br />Apply for CWCB Loan <br />CWCB Loan Recommendation <br />Loan Approved by State <br />Negotiate Loan Contract <br />Complete Final Design <br />NRCS Approves Design <br />Bid the Project <br />Award the Bid <br />Start Construction <br />Complete Construction <br />Project is Operational <br /> <br />06/07/94 <br />11/04/94 <br />06/31/95 <br />02/15/96 <br />11/01/95 <br />12/01/95 <br />01/15/96 <br />02/09/96 <br />03/01/96 <br />05/01/96 <br />05/15/96 <br /> <br />Social, Economic, and Physical Impacts <br /> <br />This project will have a positive soci,11 impact since all safety hazards associated with <br />the ditch should be eliminated. <br /> <br />The project will have a positive eCOrlomic impact providing higher quality irrigation <br />water for 200 acres of shareholders, crops and homesites. <br /> <br />The project will have significant positive physical impacts once construction is <br />complete, in that it will reduce the salt loading of the project service area by 375 tons/year. The <br />new pipeline will be buried, and all appurt.,nant structures will be reconstructed to current <br />NRCS standards. <br /> <br />Permitting <br /> <br />The company now holds all easements and rights-of-way. Mesa County UtilitylRoad <br />Crossing Permit will be the only permit required for this repair proj ect. <br /> <br />The NRCS does not require an Environmental Assessment (EA) or Environmental <br />Impact Statement (EIS) for the project. <br /> <br />10 <br />