Laserfiche WebLink
<br />Table 7: TWC Share Ownership <br />Year 2001 Blended Interest Rate <br /> <br />Shareholder Rate Cate!lorv Year 2001 Rate # Shares TWC Rate x Shares <br />WRCC Agricultural 3,5% 150 525 <br />WSSC Blended 4,77% 300 1431 <br /> Municioal/ Aaricultural <br />Totals 450 1956 <br />Blended rate for TWC <br />$2.08 million Blended Rate = 1956 / 450 shares 4.3% <br />Construction Fund Loan <br /> <br />(Note: The rate for the $1 ,6 million Emergency loan was 4,5%, When combined with the new <br />$2,08 Construction Fund loan at 4,3%, the over-all weighted loan rate for the full $3,68 million <br />loan is 4,4%,) <br /> <br />Table 8 is a summary of the financial aspects of the project. Annual assessments will increase <br />from $100 per share, up to $646 per share with the two CWCS loans totaling $3,68 million, This <br />represents an annual assessment increase of $546, or $16,28 per acre-foot, based on average <br />annual diversions 15,085 acre-feet. <br /> <br />a e lnanCla ummary <br />Project Cost $4,100,000 <br />Total CWCS Loans (90% of Project Cost) $3,680,000 <br />CWCB Loan Payment Amount, includinq 10% loan reserve $245,597 <br />Number of Shareholders 2 <br />Number of Shares of Stock 450 <br />Current Assessment per Share $100 <br />Future Assessment per Share $646 <br />Annual Project Cost per acre-foot $16,28 <br />(Averaqe annual diversions: 15,085 acre-feet) <br /> <br />Tb18F' 'IS <br /> <br />With the exception of the CWCS loans, all other funding for the project will come from cash <br />reserves and a one-time assessment increase from the Iwo major shareholders, The TWC <br />would have no other debt service on this project. Operation and maintenance costs are <br />expected to decrease with the rehabilitation of the tunnel, and can be accommodated by the <br />Company's existing budget. <br /> <br />Credit worthiness: TWC has no debt, other than the two CWCS loans, Table 9 shows the <br />Financial Ratios and indicates average ability to repay with the project in place, <br /> <br />Tunnel Water Company <br />Laramie-Poudre Tunnel Feasibility Study <br />September 2000 (Updated December 2000) <br /> <br />Page 13 of 15 <br />