My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJ00455
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
PROJ00455
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 11:43:26 AM
Creation date
10/5/2006 11:56:06 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153583
Contractor Name
Ute Water Conservancy District
Water District
0
Bill Number
XB 99-999
Loan Projects - Doc Type
Feasibility Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
105
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />II <br />I <br />I <br /> <br />TABLE 6.2 <br />COST ESTIMATE <br />PIPELINE ALTERNATIVE <br /> <br />UNIT UNIT TOTAL <br />NO. ITEM DESCRIPTlON QUANTITY PRICE AMOUNT <br />1 STEEL PIPE, 42-INCH, 300 PSI <br /> RATED, INCLUDING BENTS AND JOINTS 10,421 L.F. $109.00 $1,135,889.00 <br />2 PIPE INSTALLATION <br /> 1) SECTION I 1,950 L.F. $34.00 $66,300.00 <br /> 2) SECTION II 1,650 L.F. $38.00 $62,700.00 <br /> 3) SECTION III 60 L.F. $180.00 $10,800.00 <br /> 4) SECTION IV 744 L.F. $48.00 $35,712.00 <br /> 5) SECTION V <br /> a) 1-70 CROSSING 80 L.F. $350.00 $28,000.00 <br /> b) CASED PIPE NEAR STRUCTURE 95 L.F. $180.00 $17,100.00 <br /> 6) SECTION VI 320 L.F. $500.00 $160,000.00 <br /> 7) SECTION VII <br /> a) PIPELINE 4,300 L.F. $38.00 $163,400.00 <br /> b) TWO CHANNEL OUTLET CROSSING 50 L.F. $280.00 $14,000.00 <br /> 8) SECTION VIII 400 L.F. $500.00 $200,000.00 <br /> 9) SECTION VIV 80 L.F. $350.00 $28,000.00 <br /> 10) SECTION X 600 L.F. $34.00 $20,400.00 <br />3 PIPELINE THRUST BLOCKS 10 $1,000.00 $10,000.00 <br />4 ARMORING THE PIPE AT COLORADO <br /> RIVER ENTRANCES 100 CU.YD $18.00 $1,800.00 <br />5 AIR VALVES AND VALVE VAULTS 4 $8,000.00 $32,000.00 <br />6 RECLAMATION 100,000 CU.FT $0.50 $50,000.00 <br /> SUB-TOTAL CONSTRUCTION $2,038,101.00 <br />7 CONTINGENCIES(15%) $305,415.15 <br /> TOTAL CONSTRUCTION $2,341,516.15 <br />8 ENGINEERING DESIGN $187,321.29 <br />9 PERMITTING $72,000.00 <br />10 CONSTRUCTION ADMINISTRATION $234,151.62 <br />11 RIGHT-OF-WAY $40,000.00 <br />12 CONTINGENCIES(15%) $80,020.94 <br /> TOTAL PROJECT $2,955,009.99 <br /> <br />42 <br />
The URL can be used to link to this page
Your browser does not support the video tag.