<br />II <br />, I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />6.7 Cost Estimate and Schedule <br /> <br />A cost estimate for the proposed pipeline alternative from Station 718 + 00 to Station 822 + 21 is <br />presented in Table 6.2. The cost presented in Table 6.2 is based on published rates, engineers <br />estimates for similar projects in Colorado and interviews with pipeline contractors. The costs <br />presented in this Table should be considered preliminary in nature and are used in this report only <br />for cost comparison between alternatives presented. During the final design study and prior to <br />construction, a more detailed cost estimate will be prepared which will more accurately reflect the <br />actual construction costs. <br /> <br />Due to lack of final design information, the following assumptions were made in preparation of the <br /> <br />subject table: <br /> <br />I) The final alignment and configuration will remain the same as those presented in this <br />report. <br /> <br />2) Section I will require hard excavation including some blasting. <br /> <br />3) Section II will require excavation support, traffic control, and normal excavation with some <br />minor blasting. <br /> <br />4) Section III will require excavation of soft collapsible ground, use of excavation support, de- <br />watering, and special reclamation requirements. <br /> <br />5) Section IV will require boring and jacking the pipe into embankment material with <br />occasional boulders and cobbles. No soft ground or need for de-watering is anticipated at <br />this time. <br /> <br />6) Section V will require construction of cofferdam, soft ground excavation, and de-watering. <br /> <br />7) Section VI will require excavation of soft ground, de-watering, use of some support system, <br />and special reclamation requirements. <br /> <br />8) Section VII will require construction of cofferdam, soft ground excavation, and de-watering. <br /> <br />9) Section IV will require boring and jacking the pipe into embankment material with <br />occasional boulders and cobbles. No soft ground or need for de-watering is anticipated at <br />this time. <br /> <br />40 <br />