<br />Project Description <br /> <br />e <br /> <br />The purpose of this project is to provide a means for the Silt Water Conservancy District <br />to continue providing irrigation water to shareholders while minimizing the occurrence of future <br />disruptions of water flow, These alternatives were considered, <br /> <br />1, Continue with the existing management. <br />2, To replace the current inadequate diversion with new technology, <br /> <br />Alternative No.1 would involve maintaining the existing diversion. This would include <br />continuing to rebuild it annually, This alternative was eliminated due to cost, and because it did <br />not provide a permanent solution to the problem, <br /> <br />The selected alternative, Alternative No.2, involves the construction of a new diversion <br />approximately 1,000 feet upstream from the existing diversion, The water will be transferred in <br />940 feet of 42" HDPE low head irrigation pipe carrying 40 cubic feet of irrigation water to the <br />original ditch system, <br /> <br />Engineering designs and cost estimates for the project have been prepared by the NRCS, <br />Preliminary plans as prepared by the NRCS are attached in the back pocket of this study. <br /> <br />The NRCS estimates the costs of the completed project at $164,400.00, The NRCS cost <br />breakdown for the project is given below in Table 2, Operation and maintenance costs for this <br />project are expected to be minimal over the next thirty years, <br /> <br />. <br /> <br />Table 2. Silt Water Conservancy District -Silt Diversion-Colorado River Diversion <br />Project - Cost Estimate <br /> <br />Bid Work Spec Quantity Unit Unit Amount <br />Item NO Price <br />I Mobilization & Demobilization 8 I Job, XXX $2500 <br />2 Concrete Diversion & Pipe Inlet 31 91 C,Y, $800 $72,000 <br />3 42 inch ID PE Pipe 44 940 L.Ft. $65 $61,000 <br />4 Rock Riprap 61 700 Tons XXX $24,5000 <br />5 Water control Gate, 42 inch 71 I Each XXX $2,500 <br /> diameter <br />6 Metal Fabrication 81 I Job XXX $1,000 <br /> Total $164,400 <br /> <br />Implementation Schedule <br /> <br />Construction is expected to begin February 1,2000 and completed March 30, 2000. <br /> <br />. <br /> <br />Silt Water Conservancy District <br />Silt Diversion Project Feasibility Study <br />January 2000 <br /> <br />Page 10 of15 <br />