My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJ00449
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
PROJ00449
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 11:43:25 AM
Creation date
10/5/2006 11:55:56 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153503
Contractor Name
Cucharas Sanitation and Water District
Water District
0
County
Las Animas
Bill Number
XB 99-999
Loan Projects - Doc Type
Contract Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />. <br /> <br />EXHIBIT A <br /> <br />. <br /> <br />UYo:,c IF # ~ IF ID <br /> <br />· 1.987 <br />COLOR, <br />CONSERv~gg WATER <br />N f'OA.9D <br /> <br />AGREEMENT FOR ENGINEERING SERVICES <br /> <br />Thi s Agreement, made thi s 8 day of September, 1987, by and between <br />THE CUCHARAS SANITATION AND mrn DISTRICT, a Colorado Utility Special <br />District, hereinafter referred to as the "OWNER" and HYDRO-TRIAD, LTD., a <br />Colorado Corporation, hereinafter referred to as the "ENGINEER." <br /> <br />The OWNER intends to evaluate and determi ne the technical and economic <br />feasibility of a water storage dam on White Creek. This feasibility study <br />shall be paid for in part with financial assistance from the State of <br />Colorado acting through the Colorado Water Conservation Board, hereinafter <br />referred to as "CWCB" in the form as provided in the feasibility Report <br />Contract executed between the Depar'tJnent of Natural Resources (Colorado <br />Water Conservation Board) and the Cucharas Sanitation and Water District <br />from fund number 4008, Gf/L account, 5290 x, ABL account number 12900, <br />Original Unit 77-77-777 only. <br /> <br />The ENGINEER represents that it is a professional engineering firm with <br />the experience and expertise to perform the feasibility study in a satis- <br />factory and timely manner, and agrees to perform all of the various pro- <br />fessional engineering services for the feasibility study. <br /> <br />NOW THEREFORE, in consideration of the nutua1 covenants and promi ses <br />between the parties hereto, it is expressly agreed as follows: <br /> <br />SECTION A - ENGINEERING SERVICES <br /> <br />The ENGINEER shall furnish engineering services as follows: <br /> <br />STUDY METHODOLOGY <br /> <br />The Whi te Creek Dam and Reservoi r feasibil ity study, as presently <br />envisioned, will consist of the following major steps: <br /> <br />A. Data Collection and Coordination <br /> <br />The initial phase of the study will consist of the assembly and review <br />of avail ab1 e i nformati on needed to adequately assess the project <br />feasibility. This process will include the following activities: <br /> <br />1. Review of previous studies. <br /> <br />2. Review existing reports prepared by the U. S. Forest Service, the <br />U.S. Geo I ogi ca1 Survey, the Soil Conserva ti on Servi ce and others. <br /> <br />3. Assembly and review of relevant stream flow, climatological, and <br />water quality data. <br /> <br />- 1 - <br /> <br />EXHIBIT A <br />
The URL can be used to link to this page
Your browser does not support the video tag.