My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C153827 Contract
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
C153827 Contract
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/7/2013 2:13:08 PM
Creation date
10/5/2006 11:55:51 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153827
Contractor Name
Julesburg Irrigation District
Contract Type
Loan
Water District
64
County
Logan
Bill Number
EIA
Loan Projects - Doc Type
Contract Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
32
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />:.' <br /> <br />BALLOT <br /> <br />Notice: You must vote for one (1) proposal only. <br /> <br />REFERENDUM A. <br /> <br />YES ( ) <br />NO () <br /> <br />Shall the District debt be increased <br />$590,000.00, with a repayment cost of $1,233,600.00. <br /> <br />1. To borrow not in excess of $590,000.00 from the Colorado Water Conservancy Board <br />of the State of Colorado al an interest rate of 3.75% per annum for 30 years tor the purpose of <br />constructing a new scructure at the upper location in the South Pia lie River at the Harmony #1. <br />Diversion. <br />2. To raise the the assessment by $2.50 per acre for District bonded acres, making the <br />assessment $20.50 per acre per year to help facilitate the repayment of said loan. <br />3. To enter into one or more contracts for the purpose of constructing a new intake <br />structure, paying tor such work trom the proceeds ot the loan from the Colorado Water <br />Conservancy Board and if the total cost is in excess of $590,000.00, utilizing other revenues <br />available to the District. <br />4. To secure the repayment of sums borrowed with interest by a lien on the real property <br />of the Districl and by a Pledge of Taxes and Assessments of the District and a Certificate of . <br />Deposit in the amount of one annual payment of said loan. <br /> <br />REFERENDUM B. <br /> <br />YES .. <br />NO () <br /> <br />Shall the District debt be increased <br />$510,469.00, with a repayment cost of $1,067,607. <br /> <br />1. To borrow not in excess of $510,469.00 from the Colorado Water Conservancy Board <br />of the State of Colorado at an interest rate of 3.75% per annum for 30 years for the purpose of <br />constructing a new structure at the lower location in the South Pia lie River at the Harmony #1 <br />Diversion. <br />2. To raise the assessment by $2.00 per acre for District bonded acres, making the <br />assessmenl $20.00 per acre per year to facilitate the repayment of said loan. <br />3. To enter into one or more contracts for the purpose of constructing a new in lake <br />structure, paying for such work trom the proceeds of the loan trom the Colorado Water <br />Conservancy Board and if the total cost is in excess ot the $510,469.00, utilizing other revenues <br />available to the District. <br />4. To secure the repayment of sums borrowed with interest by a lien on the real property <br />of the District and by a Pledge of Taxes and Assessments of the District and Certificate of <br />Deposit in the amount of one annual payment at said loan. <br /> <br />REFERENDUM C. <br /> <br />YES ( ) <br />NO ( ) <br /> <br />Shall the District debt be Increased <br />$296,070.00, with a repayment cost of $619,208. <br /> <br />1. To borrow not in excess ot $296,070.00 trom the Colorado Water Conservancy Board <br />of Ihe Stale of Colorado at an interest rate of 3.75% per annum for the next 30 years for the <br />purpose of rehabilitating the existing diversion structure in the South Plalle River at the <br />Harmony #1 Diversion. <br />2. To raise the assessment by $1.50 per acre for District bonded acres, making the <br />assessment $19.50 per acre per year to facilitale the repayment at said loan. <br />3. To enler into one or more contracts for the purpose of rehabilitating the existing <br />structure, paying for such work from the proceeds of the loan from the Colorado Water <br />Conservancy Board and if the total cost is in excess of the $296,070.00, utitizing other revenues <br />available to the District. <br />4. To secure the repayment of sums borrowed with interesl by a lien on the real property <br />of the District and by a Pledge of Taxes and Assessments of the District and Certincate of <br />Deposit in the amount of one annual payment of said loan. <br />
The URL can be used to link to this page
Your browser does not support the video tag.