Laserfiche WebLink
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />The District anticipates spending another $92,600,000 in construction of the reservoir <br />and ancillary faculties for the capture, movement and treatment of water as outlined in <br />Table 1. <br /> <br />Table 1. Reuter-Hess Reservoir <br />Costs to date and Anticipated Expenditures <br /> <br />Rueter-Hess Reservoir <br />Project Costs <br />August 9, 2001 <br /> <br />Project Costs to Date <br />Water Legal <br />General Legal <br />Hydrology <br />Design <br />Engineering <br />Reservoir Road <br />EIS <br />Reservoir Benchmark <br />Survey <br />Public Relations <br />Applications and Permits <br />Community Outreach <br />Reservoir Land Purchase <br />EDAW, Inc. (Recreation Study) <br /> <br />$109,667 Y. <br />$43,858 r <br />$191,858 <br />$135,068 <br />$239,218 <br />$1,240 <br />$1,119,895 <br />$52,264 <br />$49,156 <br />$278,666 'f <br />$21,505 <br />$21,345 Y <br />$8,014,211 <br />$22,141 'f <br /> <br />Subtotal (Expenses to date) <br /> <br />$10,300,092 <br /> <br />Proposed Expenses <br />Effluent Pond Pump Station <br />Effluent Reservoir <br />Effluent Force Main <br />Newlin Water Treatment Plant <br />Rueter-Hess Reservoir <br />54-inch Pipe to Rueter-Hess <br />36-inch pipe to Rueter-Hess <br /> <br />1,200,000 <br />3,600,000 <br />9,000,000 <br />8,000,000 X <br />35,000,000 <br />9,200,000 <br />2,100,000 ;X <br /> <br />Parker Water & Sanitation District <br />Rueter-Hess Reservoir Feasibility Study <br />August 2001 <br /> <br />Page 9 of 13 <br />