My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJ00443
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
PROJ00443
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 11:43:25 AM
Creation date
10/5/2006 11:55:44 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153022
Contractor Name
Rifle, City and Town of DeBeque
Contract Type
Grant
Water District
0
County
Garfield
Bill Number
XB 99-999
Loan Projects - Doc Type
Contract Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />. <br /> <br />r"'. <br /> <br />, (. <br /> <br />Plan of Development Continued <br /> <br />Project Engineer <br />, Draftsman <br /> <br />140 hrs. <br />32 hrs. <br /> <br />6. Cost Estimates: <br /> <br />Detailed estimates for the proposed construction cost will be provided. <br />Operation and maintenance costs will also be provided. These costs will <br />be computed as total costs, annual costs and cost per thousand gallons as <br />is appropriate. Computation of annual costs and fund requirements shall <br />be computed based on interest rates and time schedules provided by the <br />Colorado Water Conservation Board. This schedule will include an emer- <br />gency operating fund. <br /> <br />"". <br />. <br /> <br />Project Engineer <br /> <br />40 hrs. <br /> <br />7. Project Evaluation: <br /> <br />This section \'/i11 show \'/hat effect the proposed construction will have on <br />present user charges and present an evaluation of the costs of operation <br />and maintenance on user charges. Typical user's charges in nearby towns <br />~1i11 be given. <br /> <br />Project Engineer <br /> <br />12 hrs. <br /> <br />8. Financial Program: <br /> <br />This chapter.wi11 develop a proposed pay-out schedule, based on data pro- <br />vided by the Water Board. <br /> <br />Project Engineer <br /> <br />12 hrs. <br /> <br />9. Review of draft with Water Board and City Official, project supervision <br />and administration. . <br /> <br />Project f1anager <br /> <br />.40 hrs. <br /> <br />Cost Summary: <br /> <br />Project Engineer <br />Civil Draftsman <br />Project Manager . <br /> <br />250 hrs. x $18.50 a <br />40 hrs. x 13.50 a <br />40 hrs. X 26.00 a <br /> <br />TOTAL <br /> <br />$4,625.00 <br />540.00 <br />1,040.00 <br />$6,205.00 <br />
The URL can be used to link to this page
Your browser does not support the video tag.