My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJ00443
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
PROJ00443
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 11:43:25 AM
Creation date
10/5/2006 11:55:44 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153022
Contractor Name
Rifle, City and Town of DeBeque
Contract Type
Grant
Water District
0
County
Garfield
Bill Number
XB 99-999
Loan Projects - Doc Type
Contract Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />; -. <br /> <br />. (. <br /> <br />\~)Er'L\\JI> <br />I; -\JL,' I_V <br /> <br />WORK PLAN AND COST <br />CITY OF RIFLE FEASIBILITY REPORT <br /> <br />~)EP 031975 <br /> <br />COLO. WAltR . <br />CQtl~ERVA110N BOARO. J <br /> <br />1. General Information: <br /> <br />The existing water report prepared in 1971-72 will be supplemented to include <br />description of the project as now planned and the phase construction schedule. <br />A project location exhibit will be prepared. A review of the project will be <br />made ~ith th~ local Game, Fish and Parks Office and Soil Conservation Board <br />for thei I' input. <br /> <br />Project Engineer <br />Draftsman <br /> <br />6, hI's. <br />.6 hI's '." <br />. <br /> <br />2. Review of City's budget, water revenues, and existing debt: <br /> <br />This \.lill update and verify data in the ex'isting study. It \1ill also provide <br />nel'/ data concerni ng recent changes i n ~/ater rates and user charges. <br /> <br />Project Engineer <br /> <br />. 2 hI's. <br /> <br />3. Service Area Map: <br /> <br />Thi s 1.1i 11 update exi sti ng maps of the di str.i buti on system. <br /> <br />Project Engineer <br />Draftsman <br /> <br />2 hI's. <br />.2 hI'S. <br /> <br />., <br /> <br />4. Water Requirements: <br /> <br />Update data in existing report and project future City water requirement. <br />This will be based on plant production and use records as are available for <br />a period of 5 to 10 years. Population projections I.,ill be presented as have <br />been prepared by various agencies. The most feasible projection for basing <br />water plant expansions I.fill be identified. Investigation of water quality <br />at the settling and infiltration pond will be made and its ability to meet <br />projected demandsl.,ill be determined. Data on existing I',ater rights and an <br />estimate of their safe yeild shall be included. <br /> <br />Project Engineer <br /> <br />. 36 hI's. <br /> <br />5. Plan of Development: <br /> <br />Included in this section will be preliminary engineering design and slzlng of. <br />all elements of equipment proposed in Phase One construction. Data relating to <br />Phase Two will also be given, but in a more general manner. This will include <br />sizing of the pumps and selection of the number of pumps required for re1ia- <br />bil ity and f1exibi1 ity. Hydraul ic design data used to size the pumps, pipe <br />line and control gate.s l'lill be given. An assessment of the geology at the site <br />of the improvements will be given as may effect construction conditions and <br />costs. Pump wet wells will be sized for proposed pump installations and pos- <br />sible future installations. Structural design criteria of these units will <br />be included. An analysis of potential flood protection required will be pro- <br />vided, based on an existing Corp of Engineers flood plain study. Hydraulic <br />conditions relating to modifications of the present filter plant will be shown <br />and units and piping I'Jill be sized accordingly. The basis for equipment <br />selection will be shown. <br /> <br />.' <br />
The URL can be used to link to this page
Your browser does not support the video tag.