Laserfiche WebLink
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />Item NQ Improvement Item Approximate <br /> Budget 1996- <br /> Contingency Items - May Be Required Within 5-Year Period <br />9. Replace the existing intake diversion dam with a more $150,000.00 <br /> reliable dam that is better able to withstand flooding and that <br /> can flush deposited sediment. <br />10. Line the Cooley Reservoir to minimize seepage losses (less $500,000.00 <br /> than 10% by agreement). <br />Total Total Possible Additional Requirements $650,000.00 <br /> Possible Improvements Required By Development <br />11. Install a high level storage tank on Cooley property to serve $750,000.00 <br /> development in the upper pressure zone. It is assumed that <br /> a one million gallon tank would be required to meet the <br /> development needs and fire protection. Project includes <br /> booster pump station and connection transmission lines. <br />12. Transmission lines for new development areas. Not Estimated <br /> <br />70-080.035:MSfR-PLN <br /> <br />IV-5 <br />