Laserfiche WebLink
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />with approximately 900 linear feet of 6-inch DIP, and include a highway crossing. Use of the <br />Stone Street pipeline is favorable since this line is relatively new and a connection could be <br />made from this pipe into the Park's existing pipeline at the Mount Vemon infiltration gallery. A <br />1-inch tap and water meter would be required at the Town limits for service to Red Rocks <br />Amphitheater. <br /> <br />7o..080.035:Msrn-PLN <br /> <br />111-21 <br />