My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJ00441
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
PROJ00441
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 11:43:25 AM
Creation date
10/5/2006 11:55:35 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153459
Contractor Name
Loveland, City of
Water District
0
County
Larimer
Bill Number
XB 99-999
Loan Projects - Doc Type
Feasibility Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
113
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />I: <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />proportional to the Loveland demand based on the proportionate shares <br />allotted to Loveland or equal to the firm demand for Vindy Gap water <br />reported in the EIS for the CBT-WG Project, whichever was greater. <br /> <br />The USBR reported that annual diversions by the VGP will average <br />approximately 54,000 ac-ft. Several calibration runs of the Vindy Gap <br />model were made by varying the portion of the computed VGP inflow to be <br />reserved for senior rights (see item 5 above), until average annual <br />diversions were comparable to the reported value of 54,000 ac-ft. <br /> <br />The 1000-year synthetic record of CBT inflows was then used in the Windy <br />Gap model and operated as described above to determine the water available <br />to Loveland from the VGP, the results of which are discussed in Section 9.0 <br />of this report. <br /> <br />6-4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.