My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJ00440
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
PROJ00440
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/8/2015 2:39:04 PM
Creation date
10/5/2006 11:55:33 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153572
Contractor Name
North Poudre Irrigation Company
Contract Type
Loan
Water District
3
County
Larimer
Bill Number
HB 85-1042
Loan Projects - Doc Type
Contract Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
41
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />r:X!-::!:5:T I' <br /> <br />SCHEDULE J.. <br /> <br />COLORADO W~TER CONSERV~~ION BOARD <br />CONSTRUCTION FUND PROGRk~ PRO:EDUR~S <br /> <br />,. Boara approval of enginee-ring firm and engineering <br />agreement between engineering firm ana projec~ sponsor. <br /> <br />2. Prepara:.ion of detailee plans ane specifications fo:' <br />authorized projects by consulting engineering firm. <br /> <br />3. Approval of detailed plans and specifications by Boar-a <br />staff (plans and specifications fa:." storage dams and <br />reservoirs must also be approvec by State Engineer's <br />office) . <br /> <br />c <br /> <br />Board st.af~ approval of biading for the project.. Board <br />st.aff present at bid opening for construct.ion. <br /> <br />\ <br />) <br />, <br /> <br />s. <br /> <br />Project sponsor may issue the notice of award and the <br />not.ice to oroceed ....ith construct.ion to t.he contrac~or <br />(both notices must be approved by t.he Board scaff before <br />they are issued). <br /> <br />6. <br /> <br />Conduct a ore-const~uction conference. Approval of <br />construct.ion schedule by Board stafL <br /> <br />i. Const.ruct.ion commences. The Board sta:f makes perloclc <br />inspections ouring const.ruction. All change oroers mU5~ <br />be approved by the Boare s:.a:: in advance ana before any <br />const.ruction on change i t.ems can commence. Eme:rgenc-y <br />i t.erns cleared by t.elephone. <br /> <br />8. The consulting enginee:- ce:-ti:ies t.hat the p:-o:lect has <br />been completed according to approved c:-a'W:.ng5 ana <br />spec:.::ications and arranges fo: final ins?€=t.ior.. <br /> <br />9. Final ins?ect.ion ana acce?:.ance 0: as-bJ,;:.lt. p:-oje:::. :>y <br />Boare sta::. <br /> <br />10. Submittal 0: as-built drawings to Board s:.a:: for <br />approval ana :i1 ins; . <br /> <br />E:):H!E!'I' D <br /> <br />102 <br />schedja <br />
The URL can be used to link to this page
Your browser does not support the video tag.