My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJ00438
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
PROJ00438
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/10/2011 9:35:26 AM
Creation date
10/5/2006 11:55:30 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153837
Contractor Name
Chatfield South Water District
Contract Type
Loan
Water District
8
County
Douglas
Bill Number
HB 98-1189
Loan Projects - Doc Type
Feasibility Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
88
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />t <br /> <br />. <br />STATE OF COLORADO <br />- <br /> <br />Colorado Water Conservation Board <br />Department of Natural Resources <br />721 Centennial Building <br />131 3 Sherman Street <br />Denver, Colorado 80203 <br />Phone, 13031866.3441 <br />fAX, (303) 866.4474 <br /> <br />Roy Romer <br />Governor <br /> <br />Jtlmes S. lochheild <br />E:o;ecutive DireLtor. DNR <br /> <br />O;:lries C. lile, P.E. <br />Director, CWCB <br /> <br />December 3, 1997 <br /> <br />Mr. Joseph E. Rottman <br />Chatfield South Water District <br />8730 W. Mountain View Lane <br />Littleton, CO 80125 <br /> <br />RE: Purchase of Water Rights <br />Loan Recommendation <br /> <br />Dear Mr. Rottman, <br /> <br />Concerning your application for a loan from the Construction Fund, I am pleased to inform you the <br />Colorado Water Conservation Board (CWCB) has decided to recommended your request for <br />$500,000 to the General Assembly for consideration in the annual Construction Fund Bill. It is our <br />understanding these funds will be used to purchase raw water rights for the Chatfield South Water <br />District. <br /> <br />The CWCB approved a loan term of20 years at an interest rate of 4.75%. I have attached a copy of <br />the updated Board memo concerning the Chatfield South Water District. Please refer to page 3 of <br />that memo and to the section "Action Taken by the CWCB, November 25, 1997". <br /> <br />When the Board recommends a loan request to be included in the Construction Fund Bill, there <br />remain several conditions: <br /> <br />a. The Bill must be approved bv the General Assemblv and silffied bv the Governor. <br />This is usually accomplished around June 1 ". <br /> <br />b. The Chatfield South Water District must pass a formal resolution. The resolution is <br />needed before we can complete the loan contract, and may require a ballot <br />referendum to allow the water rights to be used as security for the loan. Jan Illian <br />(866-3441) will send a copy of the resolution to you. Please contact Jan if you have <br />any questions on this matter. <br /> <br />c. An approved contract must be in place before funds can be advanced. Jan Illian will <br />contact you concerning our contracting procedure. It usually takes 2 to 3 months to <br />complete the contract. In the mean time you are encouraged to continue evaluating <br />water rights for possible purchase. <br />
The URL can be used to link to this page
Your browser does not support the video tag.