Laserfiche WebLink
<br />ProJect Formulation <br /> <br />Service personnel. It was decided that the problems of the reservoir <br />should have priority for investigations and funds over those of canal <br />seepage ,losses and canal structural rehabilitation. However, with the <br />large size of thereservoi r (over 25,000 acre~feet), both should be <br />investigated under the provisions of some other authority than P.L. 566. <br /> <br />The land treatment and structural measures selecte~ for inclusion in <br />this plan are those that most nearly achieve proJect obJectives. <br /> <br />33 <br />