My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJ00435
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
PROJ00435
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 11:03:44 AM
Creation date
10/5/2006 11:55:15 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153399
Contractor Name
Sedgwick-Sand Draws Watershed Conservancy District
Contract Type
Loan
Water District
64
County
Sedgwick
Bill Number
SB 81-439
Loan Projects - Doc Type
Feasibility Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
138
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />Summary <br /> <br />habitat, roads and the railroad, farmsteads and the town of Ovid, <br />Colorado. The town of Ovid is to be protected from the 100-year <br />frequency. storm event. Level of protection to the remaining flood plain <br />varies from a 50-year level at the floodwater retarding structures to a <br />5-year level at Highway 138. Consideration will be given to measures <br />that create, preserve and enhance watershed values for wildlife and <br />natural beauty and to measures that reduce environmental pollution. <br /> <br />. " <br /> <br />Works of Improvement to be Installed <br /> <br />The project measures include a program of land treatment and structural <br />measures with a total project cost of $4,316,170. Public Law 566 funds <br />are to provide $3,150,200 and other funds are to provide $1,165,970. <br />The project.is to be constructed over a 5-year installation period. <br /> <br />LAND TREATMENT MEASURES <br /> <br />Land treatment measures to be applied include practices for watershed <br />protection, fire control -intensification, land and vegetative improve- <br />ment, tree plantings for windbreaks and wildlife food and shelter, <br />irrigation water management and wildlife habitat management and enhance- <br />ment. Land treatment measures will be established by the landowners and <br />operators on private and state land in cooperation with.the Soil Conserva- <br />tion and Natural Resources Districts, the Colorado Division of Wi ldl ife <br />and-;-tohe-5-t-a-te-Foresle". ~ --------- -- ----- - - ----- <br /> <br />Costs for the land treatment measures are estimated at $902,150 which <br />will be provided by funds other than P.L. 566 funds, except for $1,500 <br />of P.L. 566 funds for accelerated technical assistance to Colorado rural <br />fire districts. <br /> <br />STRUCTURAL MEASURES <br /> <br />The structural measures included in the plan consist of 10 single pur- <br />pose floodwater retarding structures, three grade stabilization struc- <br />tures, three f100dways and 10 canal inlet structures. The floodwater <br />retarding structures have combined capacities of 5,731 acre-feet for <br />floodwater detention and sediment accumulation and are designed as dry <br />dams. The combined length of the three floodways is about 7.9 mi les. <br /> <br />The present flow condition of the floodways is ephemeral. One and two- <br />tenths miles of floodways have no or practically no defined channel. <br />The remaining reaches are manmade or previously modified channels with <br />an approxImate construction date of 1910.. The land use adjacent to the <br />floodways is agricultural. The crops grown are sugar beets, corn, <br />beans, and alfalfa. <br /> <br />3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.