My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJ00434
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
PROJ00434
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 11:03:44 AM
Creation date
10/5/2006 11:55:12 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153337
Contractor Name
Farmers Extension Ditch & Highland Lake Lateral Company
Contract Type
Loan
Water District
1
County
Weld
Bill Number
FSA
Loan Projects - Doc Type
Feasibility Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
86
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />To be able to evaluate these alternatives ~ffectively, we established a set of <br /> <br />criteria. This criteria was derived from our conversations and meetings with <br /> <br />the stockholders of the ditch, ditch compa~ies in the region with similar prob- <br /> <br /> <br />lems, contractors who install irrigation ditches and pipes, and our own observa- <br /> <br />tions and studies of the irrigation ditche$ in the area. The following guide <br /> <br /> <br />lines were generated from the above mentioned research and will be used in the <br /> <br /> <br />evaluation of each alternative. <br /> <br />1. Ultimate life span characteristics <br />2. Operation and Maintenance Costs <br />3. Ecological Considerations <br />4. Reliability of Water Supply to User's <br />5. Benefit/Cost Analysis <br /> <br />21 <br /> <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I. <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />
The URL can be used to link to this page
Your browser does not support the video tag.