My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJ00434
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
PROJ00434
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 11:03:44 AM
Creation date
10/5/2006 11:55:12 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153337
Contractor Name
Farmers Extension Ditch & Highland Lake Lateral Company
Contract Type
Loan
Water District
1
County
Weld
Bill Number
FSA
Loan Projects - Doc Type
Feasibility Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
86
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />WATER <br /> <br />At present, an average of 24,700 acre-feet per irrigation season are used by the <br /> <br />shareholders, According to the Farmers Ditch,Ditch Rider, the maximum flow rate <br /> <br />which can be supplied through the ditch on a given day is about 200 cubic feet <br /> <br /> <br />per second. The flow rate can be regulated at the headworks of the ditch by <br /> <br />opening gates as needed. Water is supplied to the farmers by ordering the amount <br /> <br />desired a day before delivery is needed. Because of the current condition of the <br /> <br />ditch, it takes this day to set the necessary check structures and have the water <br /> <br />in the ditch rise to a height sufficient to supply the amount of water ordered. <br /> <br /> <br />After rehabilitation, we expect this time period to be reduced to a few hours. <br /> <br />The Highland Lake Lateral and Farmers Extension Irrigation Ditches receive their <br /> <br /> <br />waters through the Highland and New Ish Ditches. Historically, the Ditch Companies <br /> <br /> <br />have been able to receive all the water they have needed, even during lean years, <br /> <br />as in 1977. Water for irrigation purposes are obtained by decrees on water supplied <br /> <br />by the Highland Ditch Company or from the Ish Reservoir Co. which has contractural <br /> <br /> <br />agreements with the Boulder-Larimer Irrigation and Manufacturing Company (OLD ISH). <br /> <br />The following figures have been compiled showing the available water from each <br /> <br /> <br />source for last year. <br /> <br />Highland Ditch Company (1980) <br />Reservoir water; 307 shares x 35 ac-ft./share = 10745 ac-ft. <br />River water; Big Thompson River 4205 ac-ft. x 60% issue = 2523 ac-ft. <br />Minimum water available from <br />Highland Ditch Company 13268 ac-ft, <br />Rented water (1980) 3973 ac-ft. <br />Total water available from Highland Ditch17089 ac-ft. <br /> <br />Ish Reservoir Company (1980) <br /> <br /> <br />Reservoir water; 460 shares x 5.75 ac-ft, /share = 2645 ac-ft. <br /> <br />River water; 6502 ac-ft. x 60% issue = 3901 ac-ft. <br /> <br />10 <br />
The URL can be used to link to this page
Your browser does not support the video tag.