Laserfiche WebLink
<br />Phase 3 - Phase 3, 1984 as shown on project map in now VOID, Phase 3 will be the <br />North one-half of Phase 1, 1985,: includes structure No, 11, <br /> <br />Phase 4 - Remainder of Reach 6 from struct~re No. 15 to No. 16. <br /> <br />1985 <br /> <br />Phase 1 - Remainder of Reaches 3 and 4, <br /> <br />Phase 2 - Been completed by Phase 1, 1984. <br /> <br /> <br />Phase 3 - Remainder of Reach 12, the section through Section 29, Township 7 <br /> <br />North, Range 67 West, <br /> <br />1986 <br /> <br />Phase 1 - Reach 8 from structure No. 17 to! structure No. 19. <br />Phase 2 - For the rehabilitation of any addition trouble some lengths of ditch, <br /> <br />It is recommended that these construction phases be completed as shown. We have <br /> <br /> <br />reviewed the proposed changes in phased co~struction asked for by the Soils Con- <br /> <br /> <br />servation Service. We have accommodated fhere possible, but in most cases were <br /> <br />not able to make these changes because rep~yment costs to the shareholders make <br /> <br /> <br />them prohibitive. We recommend that the a~ortization schedule, as shown in the <br /> <br /> <br />financial evaluation section of this report, be followed and that the proposed <br /> <br />rate increases be initiated immediately. <br /> <br />We also recommend that the following chain; of command (Figure 1) be followed. <br /> <br /> <br />Coordination between the Soil ConservationiService and the Contractor is a must; <br /> <br />without it, the project will have an excess of procedural problems. <br /> <br />viii <br /> <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />