Laserfiche WebLink
<br />I I <br /> <br />I <br /> <br />I <br /> <br />II <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />CONCLUSIONS AND RECOMMENDATIONS <br /> <br />In conclusion, the entire project should be constructed as phased in this report. <br /> <br />Construction should be concrete lined ditch and reinforced concrete pipe, We <br /> <br />have phased the proposed work over a period of seven (7) years, These phases <br /> <br />have been related and numbered in a similar manner as the preliminary engineering <br /> <br /> <br />report on the ditch prepared by the Soil Conservation Service. A copy of the <br /> <br />section of this report labeling the Reach boundaries of the ditch has been in- <br /> <br />cluded in the Plan of Development Chapter of this report. The following is a <br /> <br /> <br />brief summary of the proposed construction phases: <br /> <br />1980 <br /> <br />Phase 1 - The entire length of Reach 9, <br /> <br />II Phase ,2 - Part of Reach 1 from the county road to structure No, 3. <br /> <br />1981 <br /> <br />II <br /> <br />I <br /> <br />I <br /> <br />II <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />II <br /> <br />I <br /> <br />Phase 1 - End of Reach 5 and the beginning of Reach 6. The length from the <br />county road (west line of Section 3, Township 3 North, Range 68 West) <br />to structure No, 15 <br /> <br />Phase 2 - End of Reach 4, beginning of Reach 5, from structure No, 11 to structure <br />No. 12 and just downstream. <br /> <br />Phase 3 - Remainder of Reach 5, from end of Phase 2, 1981 to beginning of Phase <br />1, 1981. <br /> <br />1982 <br /> <br />Phase 1 - End of Reach 2, beginning of Reach 3 from structure No. 6 to structure <br />No, 7. <br /> <br />Phase 2 - Part of Reach 8, from structure No, 19 to structure No, 20. <br /> <br />Phase 3 - End of Reach 10, beginning of Reach 11 from structure No. 23 to Great <br />Western R.R. crossing. <br /> <br />1983 <br /> <br />Phase 1 - Remainder of Reaches 1 and 2, excluding Phase 3, 1984 as shown on Exhibit 3. <br /> <br /> <br />Phase 2 - End of Reach 6, beginning of Reach 7, 600 feet up and 100 feet down- <br /> <br />stream of structure No. 16. <br /> <br />Phase 3 - Remainder of Reach 7 from I-25 west as funds allow. <br /> <br />1984 <br /> <br />Phase 1 - From Great Western R,R, east to county road (west line of Section 29, <br />Township 7 North, Range 67 West). Includes Phase 2, 1985. <br /> <br />Phase 2 - End of Reach 12, beginning of Reach 13 from the county road (west line <br />of Section 28, Township 7 North, Range 67 West) to the outlet parshall <br />flume. <br /> <br />vii <br />