Laserfiche WebLink
<br />required to <br />(40) years, <br /> <br />repay this at an interest rate of 3% amortized over a period of forty <br />Repayment of the CWCB loan will begin two (2) years after it is made, <br /> <br />The total project cost is estimated to be ~pproximately $2,600,000. This is higher <br />than the $2,400,000 available for rehabilitation, therefore, small sections of the <br />end of the ditch may have to remain earthep, Hopefully, the remaining ditch can <br />be lined from other funds obtained by the ditch boards. <br /> <br />iii <br /> <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />