My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJ00432
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
PROJ00432
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 11:03:44 AM
Creation date
10/5/2006 11:55:07 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153738
Contractor Name
Georgetown, Town of
Contract Type
Loan
Water District
6
County
Clear Creek
Bill Number
SB 96-153
Loan Projects - Doc Type
Feasibility Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
139
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />I <br />I <br />I <br />I <br /> <br />Water Rights Currently Owned <br /> <br />The Town owns two rights in Leavenworth Creek dated 1866; one for diversions up to 3.0 cfs from <br />May 1 through September 30, and the other for 1.14 cfs from October 1 through April 30. The <br />smaller diversion is sufficient for domestic uses in the Town during the winter period. The larger <br />water right of 3.0 cfs is not of sufficient seniority to be call-proof from downstream senior water <br />rights during the SUmmer period. The Georgetown Reservoir can store up to 0.286 acre-feet. <br /> <br />I <br />I <br /> <br />The decree along with the water rights tabulation from the State Engineer's Office is attached in <br />Appendix B. <br /> <br />A detailed analysis of Georgetown's water rights was performed by MWE in 1990 and is contained in <br />Appendix E. <br /> <br />I <br />I <br />I <br />I <br />I <br /> <br />Cost Estimate <br /> <br />The selected alternative is estimated to cost $275,000. Cost estimates for 1 share of FHL water are <br />included in Appendix D. <br /> <br />Item <br /> <br />Estimated Cost <br /> <br />Water Rights Acquisition: <br />l'h shares of FHL at market rates...... <br /> <br />$240,000 <br /> <br />Augmentation Plan: <br />Engineering, legal and court fees...... <br /> <br />30,000 <br /> <br />Costs of Application for CWCB Loan..... <br /> <br />5,000 <br /> <br />I <br />I <br />I <br />I <br /> <br />Total <br /> <br />$275,000 <br /> <br />Implementation Schedule for Augmentation Plan <br /> <br />Task <br /> <br />Target ComDletion Date <br /> <br />1. Purchase Water Shares <br />3. Develop Augmentation Plan <br />4. Apply to Water Court <br />5. Plan Approved by Water Court <br /> <br />Sep 1997 <br />Oct 1997 <br />Jan 1998 <br />Jun 1999 <br /> <br />I <br />I <br />I <br />I <br /> <br />Feasibility Study: Town of Georgetown <br />Water Rights Acquisition Project <br />January 1996 <br /> <br />7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.