Laserfiche WebLink
<br />3. Require all Subcontractors to indemnify the State and <br />the Contractor against all liability and loss, and a0ainst all <br />claims and actions based upon or ari~ing out of damage or <br />injury, including death, to persons or property caused by or <br />sustained in connection with the performance of any subcontract <br />or by conditions created thereby, or based upon any violation <br />of any statute, ordinance, or regulation, and the defense of <br />any such claims or actions. <br /> <br />" <br /> <br />4. Require all Subcontractors to maintain liability <br />insurance in at lettst the following amounts: <br /> <br />a. For any injury to one person in any single <br />occurrence, the sum of One Hundred Fifty Thousand <br />Dollars (~150,000). <br /> <br />b. For any injury to two or more persons in any <br />single OCcurrence, the sum of Four Hundred Thousand <br />Dollars (~400,000). <br /> <br />Said liabtlity insurance shall name the Contractor and <br />the State as co-inaureds. No payments shall be made under this <br />contract unless a copy of a certificate of said liability <br />insurance has been filed with the Colorado Water Conservation <br />Board. <br /> <br />5. Conveyor cause title to be conveyed by warranty deed <br />to the Colorado Water Conservation Board, Department of Natural <br />Resources, State of Colorado, the following portions of the <br />proposed project f~cilities within thirty (30) days of their <br />completion: <br /> <br />a. An undivided 50 percent of the following: <br /> <br />(1) 1457+ cubic yards of concrete for lining <br />11,750+ linear feet of irrigation ditch <br />between station 440+50 and station 566+00. <br /> <br />(2) 10+ cubic yards of reinforced concrete for <br />one check str-ucture at station 452+00. <br /> <br />(3) 38+ cubic yards of concrete for eleven <br />turnouts with Parshall flumes with 330+ <br />linear feet of reinforced Concrete pipe 12 <br />inches to 18 inches in diameter and with <br />slide gates at stations 451+90, 451+95, <br />469+00, 496+00, 500+50, 508+00, 537+00, <br />537+05, 537+10, and 542+00. <br /> <br />.All of the above work is located in Sections <br />29, 30, and 31, T4N, R67W, in Weld County, <br />Colorado. <br /> <br />The warranty deed must be recorded by the Contractor <br />in the proper county or counties and all transfer taxes shall <br />be paid by the Contractor. <br /> <br />'. <br /> <br />,6. Permit periodic inspection of construction by <br />authorized representatives of the State during and after <br />construction. <br /> <br />\ <br />I <br />, <br /> <br />7. Without expense to the State, manag~, operate, and <br />maintain the project system continuously ,in an efficient and <br />economical manner, and assume all' legal liability for such <br />management, operation, and maintenance. The Contractor agrees <br />to indemnify and hold the State harmless from any liability as <br />a result of the State's ownership of the project facilities <br />identified in paragraph 5 above. The Contractor shall maintain <br />general liability insurance covering the management, operation, <br />and maintenance of the project system until. it has completed <br />purchase of the project system from the State in at least the <br />following amounts: <br /> <br />Page 2 of 7 Pages <br />