My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C153409 Contract
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
C153409 Contract
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/10/2011 10:17:09 AM
Creation date
10/5/2006 11:55:06 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153409
Contractor Name
Farmers Extension Ditch & Highland Lake Lateral Company
Contract Type
Loan
Water District
1
County
Weld
Bill Number
SB 80-67
Loan Projects - Doc Type
Contract Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />'. <br /> <br />.."urm 6-AC-OlA <br /> <br />;:r:- U 'i'vV I <br />m:rAI-- \jT OR GENCY NUMIJER <br />-04-00 <br /> <br />CONTRACT ROUTING NUMBER <br /> <br />'T 0 <br /> <br />$177 ,500 <br /> <br />," <br /> <br />CONTRACT <br /> <br />1983:, by and between the <br />Natural Resources <br /> <br />THIS CONTRACT, made this 1st day of Auaust <br /> <br />Slate of Colorado fur the use and benefit of the Department of . 1 <br />(Colorado Water Conservation Board), <br /> <br />hereinafter referred to as the State, and -2 Farmers Extension <br />Lak~ Lateral, Box 550, Johnstown, Colorado <br /> <br />hereinafter referred to as the contractor. <br /> <br />ni tch and <br />80534, <br /> <br />Hiqhland <br /> <br />WHEREAS, authority exists in Ihe Law and Funds ha,'e been budgeted. appropriated and otherwise made <br />available and a sufficient unencumbered balance thereof'remilins available ~ payment in Fund Number 4 n n R <br />G/l Account Number 53l8X, Contract Encumbrance Numbera5..::? (and ' <br />ABL Account Number l3l8~ Org. Unit 77-77-77 , <br />WHEREAS, required approval. clearance and coordination has been accomplished from and with appropriate <br />agencies: and <br /> <br />WHEREAS, pursuant to the provisions of 37-60-119, Colorado <br />Revised Statutes 1973, as amended, the State is authorized to <br />construct certain water projects for the benefit of the people <br />of the State; and <br /> <br />WHEREAS, the Contractor is a mutual ditch company in the <br />State of Colorado and wishes to undertake repairs of its <br />irrigation system, hereinafter called the project, for the <br />Farmers Extension Ditch and Highland Lake Lateral shareholders <br />in Weld County, Colorado, at an estimated cost of Three Hundred <br />Fifty-Five Thousand Dollars ($355,000); and <br /> <br />WHEREAS, a feasibility investigation of said project was <br />conducted and it was found that such a project is economically <br />feasible; and <br /> <br />WHEREAS, the State has agreed to construct said project and <br />to sell the same to the Contractor upon mutually agreeable <br />terms and conditions, subject to the availability of funding <br />for that purpose; and <br /> <br />WHEREAS, pursuant to Senate Bill No. 67, Fifty-Second <br />General Assembly of the State of Colorado, duly enacted into <br />law, the Colorado Water Conservation Board has been authorized <br />to expend a sum not to exceed One Million Two Hundred Thousand <br />Dollars ($1,200,000) for construction of the project; <br /> <br />NOW THEREFORE, in consideration of the mutual and <br />dependent covenants herein contained, it is agreed by the <br />parties hereto as follows: <br /> <br />A. The Contractor agrees that it shall: <br /> <br />1. Employ an engineering firm to prepare project plans <br />and specifications for the proposed project. Both the <br />engineering firm and the project plans and specifications shall <br />be approved by the State. <br /> <br />2. Subcontract the construction of said project to a <br />responsible and capable firm, said project to be completed <br />within two (2) years of the date of this contract in accordance <br />with the project plans and specifications and any necessary <br />modification thereof approved by the State. The State must <br />approve, in writing, all subcontracts before they become <br />effective. The above-mentioned time may be extended by the <br />State if such time is insufficient because of acts of God or <br />other acts or circumstances beyond the control of the <br />Contractor. <br /> <br />395-53.01-C010 <br /> <br />Page I ofLpages <br />*(Seeinstrul:tionson ICVCISC of last rage.) <br /> <br />102 <br />far/ex <br />
The URL can be used to link to this page
Your browser does not support the video tag.